Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2022 at 8:00 PM

Updated September 1, 2023

Renovation of a mixed-use development in Brighton, Colorado. Conceptual plans call for the renovation of a educational facility.

Question Acceptance Deadline 04/25/2022 06:00 PM EDT Questions are submitted online No Request for Proposal (RFP) to provide 27J Schools (The "District") with a Proposal response for a Contractor/Engineer for the District's West Fiber Optic Plant General Requirements - Insurance Required - License Required The method of contractor selection has not been determined at this time

Conceptual

Educational

$100,000.00

Public - County

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
198
Active Projects
74
Bidding Soon
1,720
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 2, 2023

Project location map

To Be Determined, Brighton, CO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed