BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in New Orleans, Louisiana. Contact the soliciting agency for additional information.

ITQ installation and establishment of bermuda sod, placement of protective barricade provided by Owner. Per specifications in Project Manual, install Bermuda sod in damaged areas of North Broad Avenue neutral ground to restore turf coverage and provide tree protection of existing tree. Place sectional barricade fencing provided by Parkways as protective fencing to ensure all sections are hooked together and zip-tied at each joining. Ensure 6' gap as shown on graphic in Appendix of Project Manual for routine mowing access. Contractor to water and mow turf for establishment per specifications in manual. The Code of Federal Regulations, Title 29, Occupational Safety and Health Administration (OSHA) shall apply. Safety and Health Provisions of the State of Louisiana shall apply where more stringent and where not covered by OSHA The Contractor is advised that the site is a right-of-way neutral ground park and does not contain large areas of space to provide for laydown of materials. The Contractor shall coordinate space requirements and construction activities with Parkways. Delivery of supplies, equipment, machinery, etc. must not block vehicular traffic on North Broad. Contractor is responsible for pick-up and delivery of any additional barricade fencing sections as provided by Parkways necessary for installation and protection of sod; source locations for barricade sections may vary depending on final quantity required. The Contractor shall at all times keep the area free from accumulations of waste material or rubbish caused by his employees or work. The Contractor shall keep all streets clean used in his operations. The above requirements likewise apply to suppliers making deliveries to the site and the Contractor will be held responsible for compliance by his suppliers. Upon completion and before final acceptance of the work, the Contractor shall remove all false work, all surplus dirt and materials, rubbish, and restore in an acceptable manner all property, which may have been used or damaged in the course of construction.

Post-Bid

Playgrounds / Parks / Athletic Fields

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
33
Bidding Soon
511
All Active Projects
215
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2022

May 23, 2022

img_map_placeholder

N Broad Ave, New Orleans, LA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.