Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a bridge / tunnel in Marietta, Georgia. Working plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for outdoor lighting for a bridge / tunnel.
Noonday Creek Trail at SR 3 and Noonday Creek - Pedestrian Bridge Project Description: The Town Center Community Improvement District (TCCID) and the Atlanta Regional Commission have jointly identified a capital transportation improvement project that provides a safe and convenient crossing for pedestrians and cyclists using the Noonday Creek Trail. The proposed crossing includes elevated boardwalk approaches, a bridge over SR 3/US 41/Cobb Parkway, a bridge over Noonday Creek, and a segment of on-grade trail to tie to the existing sidewalk. The total proposed crossing is approximately 0.60 miles in length, with limits in unincorporated Cobb County and the City of Kennesaw. Proposers are required to be in compliance with the "Georgia Security and Immigration Compliance Act." Disadvantaged Business Enterprise (DBE) Participation and Small Business Participation in all DOT contracts is encouraged Cobb County will affirmatively comply with Title VI of the Civil Rights Act of 1964 and 78 Stat. 252, 42 USC 2000d-42 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, part 21 Nondiscrimination Act(s). The Cobb County Board of Commissioners reserves the right to reject all Bids and waive any formalities.
Final Planning
Bridges / Tunnels
$80,000.00
Public - County
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 12, 2022
June 13, 2022
GA-3, Marietta, GA
Related To This Project
Marietta, GA
Bid Date: Jan 27 2022
Marietta, GA
Bid Date: Apr 01 2022
Marietta, GA
Bid Date: Mar 08 2022
Marietta, GA
Bid Date: Apr 08 2022
Marietta, GA
--
Marietta, GA
Bid Date: Apr 12 2022
Marietta, GA
Bid Date: Apr 14 2022
Marietta, GA
Bid Date: Apr 25 2022
Marietta, GA
Bid Date: May 26 2022
Marietta, GA
Bid Date: Jan 27 2022
Marietta, GA
Bid Date: May 24 2022
Marietta, GA
--
Marietta, GA
--
Marietta, GA
--
Marietta, GA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.