BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in San Diego, California. Contact the soliciting agency for additional information.

See attached document for full announcement. NOTE: SITE VISIT: A site visit will be held on April 21, 2022 between 8:00AM and 10:00AM for interested bidders. Interested parties are to arrive promptly at 8:00AM at 8901 La Jolla Shores Drive, La Jolla, CA, 92037. Facility manager will provide a tour of the solar panels/system. All Bidders are strongly encouraged to make a site visit to inspect all proposed work and to acquire all necessary site information to properly prepare their Quote. Failure of the Contractor to visit the site and acquire all necessary site information to properly prepare the quote shall not be acceptable cause to justify a later request for additional costs after Contract Award. Any questions that come up at the site visit must be provided to the CONTRACTING OFFICER via email at Kimberla.Fairley@noaa.gov no later than April 22, 2022 at 1:00PM MDT/MST. No questions will be answered on site. A contractor that has performed a site visit will be regarded with higher technical capability unless the contractor can provide a detailed technical approach write-up with their quote for the Government to consider in place of a site visit. ________________________________ THE PURPOSE OF THIS AMENDMENT IS TO CORRECT PAGE ONE (1), BLOCK 10 OF THE RFQ. DUE DATE FOR QUOTTIONS IS MAY 6, 2022. _________________________________ April 22, 2022 Q & A in response to quesitons submitted about requirement. Are the rates in accordance with standard prevailing wage requirements Do they need to be certified A: The applicable wage determination is attached to the RFQ. No certification is required. We see the pricing terms are FFP (and Net-30) therefore the contractor will be asked to itemize/ breakdown pricing on an hourly basis. A: No. We are looking for an annual FFP. Invoices will be expected accordingly. The RFQ states the deadline for RFQ responses is by 04/25/2022. There was previously correspondence confirming the deadline was 05/06/2022. Since we're still updating our SAM status, we may need the additional time to respond to this RFQ. A: SF-18 RFQ has been corrected. Due date is 5/6/2022.

Post-Bid

Municipal

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
70
Bidding Soon
1,081
All Active Projects
488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2022

May 16, 2022

img_map_placeholder

8901 La Jolla Shores Dr, San Diego, CA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.