Site work and paving for a mixed-use development in Orange City, Iowa. Completed plans call for site work for a playground / park / athletic field; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Project was awarded to Cleveringa Excavating in the amount of $645,228.95. Site Directions: 100 feet north of intersection of Lincoln place SE and 13th St on the west side of the road Work to Be Done: Base Bid Clearing and Grubbing; Topsoil, On-site; Excavation, Class 10; Subgrade Preparation, 12"; Modified Subbase, 2"; Modified Subbase, 6"; Sanitary Sewer Service Stub, SCH 40. PVC, 4"; Sanitary Sewer Service Stub, SCH 40. PVC, 6"; Sanitary Sewer Cleanout; Storm Sewer, Trenched, 2000D RCP, 15"; Storm Sewer, Trenched, 2000D RCP, 18"; Pipe Apron, RCP, 18"; Subdrain, Non-Perforated Single Wall HDPE, 6"; Subdrain, Perforated Single Wall HDPE, 6"; Subdrain Outlets and Connections, CMP, 6"; Water Service Stub, Polyethylene, 1"; Water Service Stub, Polyethylene, 2"; Water Service Corporation; Water Service Curb Stop and Box; Manhole, SW-402, 48"; Intake , SW-51, 24"x36" Intake, SW-512, 24"; Internal Drop Connection; Connection to Existing Manhole; Pavement, PCC, 6"; Pavement, Integral Colored PCC, 5"; Pavement, Integral Colored, PCC With Exposed Aggregate, 5"; Beam Curb, P.C. Concrete, 6" Width; Removal of Sidewalk; Removal of Driveway, Granular; Sidewalk, PCC, 5"; Detectable Warnings; Full Depth Patches; Pavement Removal; Painted Pavement Markings, Solvent/Waterborne; Painted Symbols and Legends; Temporary Traffic Control; Conventional Seeding, Seeding, Fertilizing, and Mulching; Conventional Seeding, Seeding, Fertilizing, and Mulching (Native Seed Mix); Plants with Warranty; Storm Water Pollution Prevention Plan, Preparation; Storm Water Pollution Prevention Plan, Management; Filter Sock, 8"; Filter Sock, Removal; Rip Rap, Erosion Stone; Silt Fence or Silt Fence Ditch Check; Silt Fence or Silt Fence Ditch Check, Removal of Sediment; Silt Fence or Silt Fence Ditch Check, Removal of Device; Stabilized Construction Entrance; Inlet Protection Device; Inlet Protection Device, Maintenance; Mobilization; Concrete Washout; Playground Surfacing Subbase; Irrigation System, Design-Build; Landscape Bed Preparation; Drinking Fountain; Limestone Blocks; Electrical; Splash Pad Equipment. Alternate #1: Modified Subbase, 2"; Pavement, PCC, 6"; Curb and Gutter, 2.5'x6"; Mobilization Alternate #2: Modified Subbase, 2"; Pavement, PCC, 6"; Painted Pavement Markings, Solvent/Waterborne; Painted Symbols and Legends; Mobilization See Bid Form for exact quantities. Est. Value: $ 515,517.00 Est. Completion Date: June 30, 2023 All proposals shall be made on official proposal forms furnished by the Engineer and shall contain worded and figured prices for the work bid on. All proposals shall be plainly legible, sealed, and addressed to the City of Orange City, Attn: Earl Woudstra, City Administrator, 125 Central Avenue South., Orange City, Iowa 51041. Bidder shall submit a Bidder Status Form with their bid. Failure to submit a fully completed Bidder Status Form with the bid may result in the bid being deemed unresponsive and rejected. A certified check or a bid bond of a reputable bonding ompany authorized to do business in the State of Iowa in an amount not less than ten percent (10%) of the total amount of the bid shall be included in a separate sealed envelope, plainly marked "bid bond". The bid guarantee shall be forfeited as liquidated damages if the successful bidder fails proper execution. The checks or bid bonds of the lowest two or more bidders may be held for the earlier of 7 days after the effective date of the agreement or 61 days after the bid opening, whereupon Bid Security furnished by such bidders will be returned. Other checks or bid bonds will be returned after the tabulation of bids is completed. Performance and Payment Bonds: The successful bidder must execute performance and payment bonds, each in an amount equal to one hundred (100%) percent of the contract amount to ensure a timely, efficient, and complete performance. The bonds shall be issued from a reputable bonding company authorized to do business in the State of Iowa. Liquidated Damages: Liquidated damages will be assessed the contractor in the amount of five hundred dollars ($500.00) per working day that the work remains uncompleted after the end of the contract period with due allowances for extensions due to conditions beyond the control of the contractor. Withdrawal of Bids: No submitted bids may be withdrawn for a period of thirty (30) days from the scheduled closing time for the receipt of bids. Payment: The Contractor will be paid monthly in an amount equal to ninety-five percent (95%) of the Work completed during the previous month according to the Engineer's estimate. The final payment will be made not less than thirty (30) days after completion of the Work and acceptance by the City. No final payment will be due until the Contractor has certified that the materials, labor, and services have been paid for in accordance with the Project Manual . The right to accept or reject any or all bids and to waive informalities is reserved

Award

Playgrounds / Parks / Athletic Fields

$645,229.00

Public - City

Paving, Site Work

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
16
Bidding Soon
239
All Active Projects
121
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2022

January 3, 2023

img_map_placeholder

13th St SE & Lincoln Pl SE, Orange City, IA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.