Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2022 at 8:00 PM
Updated September 14, 2023
Site work, paving and outdoor lighting for a mixed-use development in Kingman, Arizona. Working plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; for outdoor lighting for a road / highway; and water / sewer project.
The City of Kingman (City) is seeking a qualified construction manager/general contractor to provide complete construction services as the Construction Manager at Risk (CMAR) for the Beale St Streetscape and Improvements project. The City of Kingman is improving ADA access and pedestrian safety, promoting walkability, improving exposure for local merchants and bettering the image of the city for visitors. This project is located in the historic downtown area on Beale Street, from First Street to Sixth Street, a distance of approximately 2,700 feet. This project will include a traffic, utility, drainage, and complete street study to define roadway lane configurations, intersection improvements, traffic control devices, signage, pavement marking improvements, vertical realignment, lighting, landscaping, curb and gutter, sidewalk, drainage improvements, utility improvements, ADA improvements, and aesthetic improvements related to the City desire to further develop the streetscape and livability of Beale Street. Questions pertaining to the consultant selection process or contract issues should be directed to the City of Kingman Public Works Department Project Manager Curtis Larsen clarsen@cityofkingman.gov . The CMAR will be selected through a qualifications-based selection process. Firms interested in providing CMAR services must submit a Statement of Qualifications (SOQ) that addresses the issues listed in the RFQ packet. The City of Kingman reserves the right to reject any or all SOQs, to waive any informality or irregularity in any SOQ received, and to be the sole judge of the merits of the respective SOQs received. Shortlist Confirmed.
Final Planning
Roads / Highways
$7,000,000.00
Public - City
Outdoor Lighting, Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 7, 2022
November 7, 2022
Beale St, Kingman, AZ
Related To This Project
Kingman, AZ
Bid Date: Dec 13 2023
Kingman, AZ
--
Kingman, AZ
--
Kingman, AZ
--
Kingman, AZ
Bid Date: Jan 25 2023
Kingman, AZ
Bid Date: Jun 07 2022
Kingman, AZ
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
