BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Rocky Mount, Virginia. Completed plans call for site work for a water / sewer project.

610 Power Dam Road, Rocky Mount, Virginia, 24151 Scope of Work - Onsite Sewage System Installation Project The contractor shall furnish all labor, supervision, equipment, tools, parts, supplies and materials, as necessary, to perform the services as described herein: 1) Construct an onsite sewage system that meets the location and construction specifications of the Sewage Handling and Disposal Regulations (12VAC5-610-10 et seq., the Regulations), and all other applicable state and local laws, regulations, and ordinances. Construct the above onsite sewage disposal system in compliance with the Franklin County Health Department (FCHD) Construction Permit 133-21-0333 at 610 Power Dam Road, Rocky Mount, Virginia, 24151 in the location shown on the permit. The permit contains additional conditions, notes, and information needed to construct the onsite sewage system. 3) Within 48 hours of signature of agreement to construct the onsite sewage disposal system, the contractor shall have the contents of the existing 1000 gallons septic tank serving the subject property pumped by a properly licensed sewer hauler. The contents of the exiting septic tank shall be pumped every 14 days up to one week prior to construction of the repair permit. The contents of the exiting septic tank shall be pumped every 48 hour for one week prior to installation of the repair onsite sewage system. 4) As necessary, provide or subcontract with a licensed plumber and electrician to provide plumbing and electrical required to convey the wastewater from the house to the onsite sewage system as required by the Regulations, and the Virginia Uniform Statewide Building Code (VUSBC). This includes obtaining or assuring that the owner obtains all permits and inspections as may be required by the local building authority in compliance with the VUSBC. 5) Abandon any unused component of the former onsite sewage system as specified by the FCHD Construction Permit 133-21-0333. 6) Obtain a final installation inspection from the system designer, Roger Maxie, Alternative Onsite Soil Evaluator, and assure that the onsite sewage system complies with the Regulations. 7) Provide all required documentation to the FCHD following completion of construction and obtain an Operation Permit for the onsite sewage system. 8) Follow all regulations and permitting pertaining to erosion and sediment control including stabilizing, seeding and grading the site after construction to return to the original state. Control construction runoff with proper practices so as not to become a nuisance to the owner or to neighboring properties or cause sediment to be discharged into state waters and drainage ditches. Any construction debris must also be removed from the site and disposed of properly. 9) Bidders shall comply with all requirements of the Department of Professional and Occupational Regulations (DPOR) for contracting and executing the contract with the Virginia Department of Health. Must provide a copy of Class A or B contractor's licenses from DPOR, Conventional Sewage Disposal System Contracting (CDS) specialty or Alternative Sewage Disposal System Contracting (ADS) specialty from DPOR, Master Conventional Onsite Sewage System Installer or Master Alternative Onsite Sewage System Installer license from DPOR, and proof of insurance. Bidders contacted by VDH to provide any missing required documents, must provide the document within 24 business hours or their bid will be considered non-responsive. For additional questions please contact Angelica Cipara via email: angelica.cipara@vdh.virginia.gov When responding to solicitation Bidders must attach a document listing breakdown of total cost. If Bidder is selected for award, the Bidder shall be required to provide a signed Notice to proceed form within 3 business days of notification. VDH will provide a form for signature

Post-Bid

Water / Sewer

$75,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
26
Bidding Soon
717
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 3, 2022

July 5, 2022

img_map_placeholder

610 Power Dam Rd, Rocky Mount, VA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.