Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work and renovation of a mixed-use development in Baton Rouge, Louisiana. Design plans call for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and laboratory facility.
As of March 22, 2023, an architect has been selected and this project is in the design phase. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: This project consists of renovations to three buildings, Ruffin Pleasant Hall East Annex (14,271 s.f.), Dalrymple Memorial Building (14,750 s.f.) and either the Military Science Building (38,250 s.f.) or Jesse Coates Hall (48,459 s.f.) in order to relocate occupants and allow for demolition of other buildings. The renovation of Ruffin Pleasant Hall East Annex consists of complete interior renovations as well as exterior improvements. It will also include abatement, architectural and MEP work to house a Media Lab and a Public Policy lab. The Dalrymple Building will also be a complete renovation of the interior and exterior improvements and includes subsequent build-out to house occupants relocated from other buildings. The renovations to either the Military Science Building or Jesse Coates Hall will be limited to interior renovations to accommodate relocated electrical engineering students and faculty. The second phase of this project involves the complete demolition of the Electrical Engineering Building (41,500 s.f.), the Manship School Research Facility (15,500 s.f.), the Veterinary Science Annex (2,160 s.f.), the Veterinary Science Parasite Building (3,264 s.f.) and the Veterinary Science Poultry Isolation Building (2,504 s.f.). The demolition of these buildings includes hazard abatement, removal of slab, capping of utilities and final grading of the site. Designer shall be responsible for all associated environmental remediation including, arranging for sample testing of suspect hazardous materials, making third party sampling, testing and air monitoring will be a reimbursable expense. Design services and fees are based on, and limited to, Program Completion through Construction Documents (60%). At the owners option, the contract may be amended to include additional phases with the corresponding fee and time adjustment. The Designer shall prepare and submit all required drawings to Facility Planning & Control in AutoCAD and hard copy. Drawings shall follow the format specified in the Instructions to Designers for AutoCAD Drawings Submittal. The available funds for construction (AFC) are approximately $12,840,775.00 with a fee of approximately $529,436.00. Contract design time is 400 consecutive calendar days; including 133 days review time. Thereafter, liquidated damages in the amount of $200.00 per day will be assessed. Further information is available from Michael Johnson, Facility Planning & Control, michael.johnson@la.gov, (225)342-0962. The method of Contractor Selection has not been Determined at this time.
Design
Educational
$12,840,775.00
Public - State/Provincial
Demolition, Renovation, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
June 6, 2023
156 E Boyd Dr, Baton Rouge, LA
Related To This Project
Baton Rouge, LA
Bid Date: Apr 26 2022
Baton Rouge, LA
Bid Date: Apr 26 2022
Baton Rouge, LA
Bid Date: Apr 19 2022
Baton Rouge, LA
Bid Date: Apr 27 2022
Baton Rouge, LA
Bid Date: Apr 19 2022
Baton Rouge, LA
--
Baton Rouge, LA
Bid Date: Apr 22 2022
Baton Rouge, LA
Bid Date: Apr 20 2022
Baton Rouge, LA
Bid Date: Apr 21 2022
Baton Rouge, LA
Bid Date: Apr 19 2022
Baton Rouge, LA
Bid Date: Apr 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--