Site work and new construction of a mixed-use development in Pineville, Louisiana. Design plans call for site work for a military facility; and for the construction of a military facility.
As of October 27, 2022, an architect has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2023. *The closed solicitation has been included below for reference: Applications shall be submitted on the standard LSB - 1 (September 2019 edition) only, with no additional pages attached. Please be sure to use an up-to-date copy of the form. These forms are available at the selection board office and on the Facility Planning & Control website. Do not attach any additional pages to this application. Applications with attachments in addition to the pre-numbered sheets or otherwise not following this format will be discarded. One fully completed signed copy of each application shall be submitted. The copy may be printed and mailed or printed and delivered or scanned in PDF format and e-mailed. Printed submittals shall not be bound or stapled. E-mailed PDF copies, as well as printed copies, shall be received by Facility Planning & Control within the deadline stated above. The date and time the e-mail is received in the Microsoft Outlook Inbox at Facility Planning & Control shall govern compliance with the deadline for e-mailed applications. Timely delivery by whatever means is strictly the responsibility of the applicant. By e-mailing an application the applicant assumes full responsibility for timely electronic delivery. DO NOT submit both printed and e-mail copies. Any application submitted by both means will be discarded. New Administration, Emergency Operations and Warehouse Building, Camp Beauregard, Pineville, Louisiana, Project No. LA22-A-027. This project consists of two new buildings at Camp Beauregard in Pineville: an Administration and Emergency Operations building (Phase I) and a Warehouse building (Phase II). Phase I is approximately 8,857 s.f. and is envisioned as a new single story structure on concrete slab with approximately 20 office spaces, an emergency operations/ conference room with communications-information systems, kitchen with break area, latrines with showers, file storage area, accessory spaces, etc., with full mechanical, electrical and plumbing. Phase I shall have separate entrances and be designed with appropriate security levels and the ability to sustain extended Emergency Response Operations. The project includes associated outside support structures: parking, lighting, utilities infrastructure, back-up generator(s), etc. Designer shall follow design standards as applicable: State of Louisiana Facility Design Guidelines, Louisiana National Guard Guiding Principles, Camp Beauregard Installation Guidelines and National Guard regulations, ADA-AG, Life Safety Code, applicable building codes, appropriate LEED rating, etc., and be consistent with Camp Beauregards building aesthetic standards. Design includes all investigative site surveys: topographic, geotechnical, utilities and other investigations deemed necessary. Investigative services may be authorized as an increase to the Designers fee. Project must be completely designed and ready to bid not later than November 15, 2022. The funds Available for Construction (AFC) of Phase I is approximately $3,360,000.00 with a Designers fee of approximately $254,061.00. Phase II may be awarded by amendment to Designers contract, subject to the availability of funding. The Designer shall prepare and submit all required drawings to the Military in AutoCAD and hard copy. Drawings shall follow the format specified in the Instructions to Designers for AutoCAD Drawings Submittal. Contract design time is 150 consecutive calendar days; including 50 days review time. Thereafter, liquidated damages in the amount of $500.00 per day will be assessed. Further information is available from Colonel (Ret) Michael Deville, Military, michael.p.deville.nfg@mail.mil, (318)641-5909. GENERAL REQUIREMENTS APPLICABLE TO ALL PROJECTS: Applicants are advised that design time ends when the Documents are complete, coordinated and ready for bid as stated in to Article 3.3.1 (4) of the Capital Improvements Projects Procedure Manual for Design and Construction. Documents will be considered to be complete, coordinated and ready for bid only if the advertisement for bid can be issued with no further corrections to the Documents. Design time will not necessarily end at the receipt of the initial Construction Documents Phase submittal by Facility Planning and Control. Any re-submittals required to complete the documents will be included in the design time. In addition to the statutory requirements, professional liability insurance covering the work involved will be required in an amount specified in the following schedule. This will be required at the time the Designers contract is signed. Proof of coverage will be required at that time. SCHEDULE LIMITS OF PROFESSIONAL LIABILITY Construction Cost $0 to $10,000,000 $10,000,001 to $20,000,000 $20,000,001 to $50,000,000 $3,000,000 Over $50,000,000 Limit of Liability $1,000.000 $1,500,000 $3,000,000 To be determined by Owner Applicant firms should be familiar with the above stated requirements prior to application. The firm(s) selected for the project(s) will be required to sign the states standard Contract Between Owner and Designer. When these projects are financed either partially or entirely with Bonds, the award of the contract is contingent upon the sale of bonds or the issuance of a line of credit by the State Bond Commission. The State shall incur no obligation to the Designer until the Contract Between Owner and Designer is fully executed. Firms will be expected to have all the expertise necessary to provide all architectural services required by the Louisiana Capital Improvement Projects Procedure Manual for Design and Construction for the projects for which they are applying. Unless indicated otherwise in the project description, there will be no additional fee for consultants. Facility Planning and Control is a participant in the Small Entrepreneurship Program (the Hudson Initiative) and applicants are encouraged to consider participation. Information is available from the Office of Facility Planning and Control or on its website. ANY PERSON REQUIRING SPECIAL ACCOMMODATIONS SHALL NOTIFY FACILITY PLANNING AND CONTROL OF THE TYPE(S) OF ACCOMMODATION REQUIRED NOT LESS THAN SEVEN (7) DAYS BEFORE THE SELECTION BOARD MEETING. The tentative meeting date for the Louisiana Architectural Selection Board is Wednesday, May 18, 2022 at 10:00:00 AM in room 1-100 Louisiana Purchase Room of the Claiborne Building, 1201 North Third Street, Baton Rouge, LA 70802.
Design
Military
$3,360,000.00
Public - State/Provincial
New Construction, Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2023
To Be Determined, Pineville, LA
Related To This Project
Pineville, LA
Bid Date: Oct 04 2022
Pineville, LA
Bid Date: Nov 29 2022
Pineville, LA
Bid Date: Sep 15 2022
Pineville, LA
Bid Date: Dec 02 2022
Pineville, LA
Bid Date: Dec 14 2022
Pineville, LA
Bid Date: Feb 13 2023
Pineville, LA
Bid Date: Nov 17 2022
Pineville, LA
Bid Date: Nov 15 2022
Pineville, LA
Bid Date: Nov 15 2022
Pineville, LA
Bid Date: Nov 15 2022
Pineville, LA
Bid Date: Nov 22 2022
Pineville, LA
Bid Date: Oct 12 2022
Pineville, LA
Bid Date: Nov 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.