BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a military facility in Marksville, Louisiana. Conceptual plans call for the renovation of a military facility.

Do not attach any additional pages to this application. Applications with attachments in addition to the pre-numbered sheets or otherwise not following this format will be discarded. One fully completed signed copy of each application shall be submitted. The copy may be printed and mailed or printed and delivered or scanned in PDF format and e-mailed. Printed submittals shall not be bound or stapled. E-mailed PDF copies, as well as printed copies, shall be received by Facility Planning & Control within the deadline stated above. The date and time the e-mail is received in the Microsoft Outlook Inbox at Facility Planning & Control shall govern compliance with the deadline for e-mailed applications. Timely delivery by whatever means is strictly the responsibility of the applicant. By e-mailing an application the applicant assumes full responsibility for timely electronic delivery. DO NOT submit both printed and e-mail copies. Any application submitted by both means will be discarded. Marksville Readiness Center Sustainment, Marksville, Louisiana, Project No. LA22-A-047. This project consists of complete interior and exterior sustainment and renovation work at the Marksville Readiness Center. The Readiness Center is approximately 12,750 s.f. and the project scope includes, but is not limited to, foundation repair, renovation of interior offices, kitchen, classroom, storage, latrines and drill hall spaces, replacement of interior and exterior openings, repairs to exterior facade, new interior finishes and MEP system improvements. Design and construction of the project shall follow the Louisiana National Guard guiding Principles, Design Guide (DG) 415-1, DG 415-5 and NG Pam 415-12; as well as all applicable local, state and federal codes. Designer shall be responsible for all associated nvironmental remediation including arranging for sample testing of suspect hazardous materials and making determinations regarding extent of required environmental remediation required to facilitate the renovations. Should suspect asbestos containing items require abatement to accomplish the project, the Designers contract may be amended to include testing, abatement design and/or air monitoring at the Owners discretion. The design will include all investigative site surveys: topographic, geotechnical, survey, drainage and other investigations as required. Investigative services may be authorized as an increase to Designers fee. Design and construction will take into account that the building will remain occupied for the duration of the project. The funds available for construction (AFC) are approximately $1,458,500.00 with a Designers fee of approximately $117,629.00. At this time, a fee of approximately $76,459.00 is available for complete Title 1 services and the $41,170.00 balance for Title II may be awarded by amendment to Designers contract, subject to the availability of funding. Project must be completely Designed and ready to bid no later than November 04, 2022. The Designer shall prepare and submit all required drawings to the Military in AutoCAD and hard copy. Drawings shall follow the format specified in the Instructions to Designers for AutoCAD Drawings Submittal. Contract design time is 120 consecutive calendar days; including 40 days review time. Thereafter, liquidated damages in the amount of $200.00 per day will be assessed. Further information is available from Colonel (Ret) Michael Deville, Military, michael.p.deville.nfg@mail.mil, (318)641-5909. Applicants are advised that design time ends when the Documents are complete, coordinated and ready for bid as stated in to Article 3.3.1 (4) of the Capital Improvements Projects Procedure Manual for Design and Construction. Documents will be considered to be complete, coordinated and ready for bid only if the advertisement for bid can be issued with no further corrections to the Documents. Design time will not necessarily end at the receipt of the initial Construction Documents Phase submittal by Facility Planning and Control. Any re-submittals required to complete the documents will be included in the design time. In addition to the statutory requirements, professional liability insurance covering the work involved will be required in an amount specified in the following schedule. This will be required at the time the Designers contract is signed. Proof of coverage will be required at that time. Construction Cost $0 to $10,000,000 $10,000,001 to $20,000,000 $20,000,001 to $50,000,000 $3,000,000 Over $50,000,000 Limit of Liability $1,000.000 $1,500,000 $3,000,000 To be determined by Owner Applicant firms should be familiar with the above stated requirements prior to application. The firm(s) selected for the project(s) will be required to sign the states standard Contract Between Owner and Designer. When these projects are financed either partially or entirely with Bonds, the award of the contract is contingent upon the sale of bonds or the issuance of a line of credit by the State Bond Commission. The State shall incur no obligation to the Designer until the Contract Between Owner and Designer is fully executed. Firms will be expected to have all the expertise necessary to provide all architectural services required by the Louisiana Capital Improvement Projects Procedure Manual for Design and Construction for the projects for which they are applying. Unless indicated otherwise in the project description, there will be no additional fee for consultants. Facility Planning and Control is a participant in the Small Entrepreneurship Program (the Hudson Initiative) and applicants are encouraged to consider participation. Information is available from the Office of Facility Planning and Control Any person requiring special accommodations shall notify facility planning and control of the type(s) of accommodation required not less than seven (7) days before the selection board meeting. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Military

$50,000,000.00

Public - State/Provincial

Renovation

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
36
Bidding Soon
402
All Active Projects
199
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2023

img_map_placeholder

To Be Determined, Marksville, LA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.