Published June 14, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a bridge / tunnel in Royersford, Pennsylvania. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

he project generally consists of rehabilitating the existing steel girder bridge that spans the Schuylkill River and connects Royersford to Spring City, Pennsylvania. The Work will be performed under one Contract Owner:BOROUGH OF ROYERSFORD 300 Main Street Royersford, PA 19468 Engineer:ARRO CONSULTING, INC. 321 N. Furnace St., Suite 200 Birdsboro, PA 19508 Successful bidder will be selected by Owner at a later date. Questions will be accepted until 3:00 p.m., prevailing time, on June 2, 2022; All questions must be submitted through portal, The apparent low bidder and the next two lowest bidders must submit, to the Engineer, originals of the Bidding Documents within two (2) business days from the date of the bid opening. Reproduction of the Bidding Documents and placement on web sites other than PennBid, is not permitted. Bids may be modified or withdrawn at any time prior to the opening of Bids. After the Bid opening, Bids may be withdrawn only by complying with Commonwealth of Pennsylvania laws and regulations. A summary of such laws and regulations is given in the Instructions to Bidders (Document 00100). Bids shall remain open for a period of 60 days from the date of Bid opening unless award is delayed by a required approval from a governmental agency, the sale of bonds, or the award of a grant or grants, in which event the Bids shall remain open for a period of 120 days from the date of Bid opening. See Instructions to Bidders for other provisions on the time available for acceptance of Bids. The Contract will be subject to the Prevailing Minimum Wage Determination established by the Commonwealth of Pennsylvania, Department of Labor and Industry. It is brought to the attention of the Bidder that the Project will be funded by the Commonwealth of Pennsylvania Commonwealth Financing Authority, the Montgomery County Housing and Community Development (MCHCD), and Department of Conservation and Natural Resources (DCNR). The contract is subject to the regulations contained in the Grant. Bidder will be required to document compliance with the affirmative step outlined in the Guidelines on Utilization of Disadvantaged Business Enterprise (DBE) Firms: attached to the Bidding Documents. Failure to submit documentation within ten days after Bid opening date will result in rejection of the Bid. Each Bid must be accompanied by Bid security in the form of a certified check, bank check, irrevocable letter of credit, or Bid bond (on the form included with the Bidding Documents) for 10 percent of the Bid total. It is a requirement of this Contract that at least 50% of the Work be performed by prime Bidder own work force, not by subcontractor(s). It is a requirement of this Contract that Bidder shall have a minimum 5 year, 5 project documented experience in the type of Work required by this Project. The cost of each project included in Bidder questionnaire must be in excess of $250,000 in order to be considered project experience. Bidders, subcontractors, their workers and any persons providing labor and products to the Project shall be persons lawfully permitted to work in the United States and the Commonwealth of Pennsylvania. As a precondition of being awarded a Contract, Successful Bidder, and its subcontractor(s) are required, to provide confirmation of compliance with Act 127 of 2012, the Public Works Employment Verification The BOROUGH OF ROYERSFORD hereby reserves the right, which is understood and agreed to by all Bidders, to reject any or all Bids and to waive any omissions, errors, or irregularities in any Bid. 1 Substantial Completion 180 LD- $1,000.00 2 Final Completion 210 LD- $1,000.00 3 Grant Deadline 12/31/2024 The project is mainly to convert the existing railroad trestle bridge, that spans the Schuylkill River between Spring City and Royersford, to become a pedestrian bridge for the local trail system. The project generally consists of, but is not limited to, clearing and grubbing of the site to the extents shown on the Drawings, the miscellaneous concrete maintenance necessary to repair and reinforce the piers and abutments on the bridge, replacement of longitudinal beams and repair of roller beams that are required to, restore the bridge and ensure long term bridge functionality, minor steel repairs to the top portion of the bridge, removal of the original railroad ties in order to install bridge risers, framing, and the precast concrete deck, providing a guard rail/railing system, excavating for, forming, reinforcing steel, and pouring reinforced concrete approaches at each end of the bridge, installing Wayfinding and Safety signage, and all site and trail restoration work both in and out of the work area as a result of the work of this Project.

Bid Results

Bridges / Tunnels

$3,289,000.00

Public - City

Paving, Site Work

16

31

4

7

Subscribe For Documents

77 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Vehicular Access and Parking, Temporary Barriers and Enclosures, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete, Grouting
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Plants, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
388
Active Projects
199
Bidding Soon
3,044
All Active Projects
1,488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 9, 2022

July 11, 2022

img_map_placeholder

To Be Determined, Royersford, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Trestle Bridge Rehabilitation Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.