BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a bridge / tunnel in La Grange, Texas. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for paving for a bridge / tunnel; and for site work for a bridge / tunnel.

For Ps&e Package Questions Call: Ryan Simper 1512 Fm 102 Wharton, Tx 77488 979/532-3141 Length: 0.01 Mi Time for Completion: 120 Working Days County Control Limits From Highway Project Limits to ------------------------------------------------------------------------------ Wharton 0913-09-106 at Draw (Cr 448) Cr Br 2020(911) Str# 132410aa0142001 Length: 0.0580 Miles Wharton 0913-09-108 Colorado Draw (Cr 267) Cr Br 2020(603) Str# 132410aa0306001 Length: 0.0620 Miles TXDOT - Bridge Replacement

Award

Bridges / Tunnels

$2,799,229.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
100
Bidding Soon
2,728
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

July 1, 2022

Project location map

To Be Determined, La Grange, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.