BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2022 at 8:00 PM

Updated February 28, 2024

Site work for a water / sewer project in Celina, Texas. Completed plans call for site work for a water / sewer project.

Utility Improvements for The Punk Carter Parkway Extension in the Light Farms Project. The Punk Carter Parkway Extension work consists of approximately 148 LF of Storm Pipe, 373 LF of Waterline by bore and open cut, Traffic Control, Erosion Control Measures and related work in the Light Farms Master Planned Community in Celina, Collin County, TX. Punk Carter Parkway Extension o Grading entails establishment of a SWPPP, erosion control measures, demolition, removal of signage and barricade and pavement subgrade, dirt haul-off/haul in as necessary, traffic control and related grading completion work. o Utility work entails installation of storm line, water line bore and open cut, traffic control and other related work. o Paving consists of 7" & 10" thick concrete roadway paving, sidewalks and street light installation, electrical conduit design and installation, signage installation, traffic control and other related work. Spoils and haul-off to stay within Light Farms unless instructed otherwise by client or engineer. Existing roadways must be kept clean at all times

Bid Results

Water / Sewer

$262,108.00

Public - County

Site Work

53

18

7

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
374
Active Projects
133
Bidding Soon
3,933
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2022

June 15, 2022

Project location map

Punk Carter Pkwy, Celina, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.