BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2025 at 8:00 PM

Updated August 20, 2025

Site work and paving for a playground / park / athletic field in Montebello, California. Working plans call for site work for a playground / park / athletic field; and for paving for a playground / park / athletic field.

**As of August 19, 2025, bids were rejected. No definite date for the rebid.** The City of Montebello seeks bids from qualified contractors to provide signage services, in relation to the second phase of the City’s Montebello Rio Hondo Access Improvement Project (Sign) located at the intersection of Rea Drive & Beverly Boulevard. Services include electrical and signage installation to improve connections from the Rio Hondo River entrance to Beverly Boulevard and Grant Rea Park. Project Type Bid Response Types Line Items Bid/Proposal Documents (required) Type of Award Lump Sum Categories334515 - Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals 339950 - Sign Manufacturing Bid Bond 100.00% Payment Bond 100.00% Performance Bond 100.00% Pre-Bid Meeting Yes - Mandatory Pre-Bid Meeting Date 07/09/2025 8:00 AM (PDT) Pre-Bid Meeting Location Southwest corner of Beverly Blvd. and E. Beverly Terrace Online Q&A Yes Q&A Deadline 07/10/2025 12:00 PM (PDT) The work to be performed or executed under these specifications consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the contract documents to construct the above stated project. It is the intent of this contract to have the contractor perform the "Project", and other appurtenances in accordance with the latest adopted edition of the Building Code, the 2021 Standard Plans for Public Works Construction (SPPWC), 2021 Standard Specifications for Public Works Construction "Greenbook" (referred to as Standard Specification), 2023 Caltrans Standard Plans and Specifications unless otherwise shown.

Final Planning

Playgrounds / Parks / Athletic Fields

$380,098.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
3
Bidding Soon
2,107
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

February 19, 2026

Project location map

Rea Dr & Beverly Blvd, Montebello, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.