BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Bel Air, Maryland. Working plans call for the renovation of a educational facility; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The owner has selected a Construction Manager. A timeline for construction has not yet been established. BASIC SCOPE: Harford Technical Limited Renovation Provide complete construction management services utilizing multiple prime contractors for the limited renovation of the existing Harford Technical High School. Harford Technical High School was built in 1978 as a 138,500sf Technical School. In 1999, a 77,665sf addition was completed, and the school became a comprehensive Technical High School. At that time, the school also received some systemic upgrades. The school is currently 218,000sf. Over recent years, systemic issues have become prevalent, most notable within the original portion of the building. Harford Technical High School (HTHS) has been identified as the highest priority for systemic renovation for the past three (3) years. Additionally, HCPS' instructional stakeholders have identified multiple educational program needs. This project is a phased/occupied limited renovation project. The approximate construction budget is estimated to be $37,380,500.00 The scope includes but is not limited to the following: Structural & envelope Remove and replace exterior windows with new aluminum thermally broken frames, with operable sections in classroom areas. Replace existing exterior doors. Replace roof Mechanical HVAC systemic renovation HVAC for existing greenhouse Plumbing Upgrade water/fire service to the school, upgrades to sprinkler system. Replace domestic water heating tank with efficiency gas fired DHW heaters @100 gallons. This allows the building to have DHW without requiring the boilers to be operational year-round. Replace all toilet and lavatory fixtures in original portion of the school. Electrical New upgraded electrical service with increased capacity to meet code requirements. Request for Qualifications Construction Management Services Harford Technical High School Limited Renovation Page 2 of 5 Replacement of all existing lighting to high efficiency LED lighting. Upgrades / replacement of all low voltage systems such as fire alarm, voice, video, and data. Harford tech has a primary electrical metering; BGE will require this to be changed to secondary metering. ADA and life safety Fire alarm system replacement (entire building) Elevator replacement Add a security vestibule Security camera and access upgrades Other Systemic Resurface paving for original driveway and parking lot Replace ceiling tiles throughout Program Upgrades Culinary arts program - Upgrade teaching space, professional kitchen, and café to meet all program and state requirements Cosmetology program - Modernization and upgrades to meet current standards Welding program - Upgrade gas service, electrical service, and ventilation Machine shop - Electrical upgrades CADD Infrastructure changes and Wi-fi upgrades Academy of Health Professions (AHP) - Create a physical therapy training space Automotive - Resurface outdoor concrete auto shop area Main gymnasium bleacher replacement Recommendation of award: september 19, 2022 Interviews: Week of August 22, 2022

Pre-Construction/Negotiated

Educational

$37,380,500.00

Public - County

Paving, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
247
Active Projects
122
Bidding Soon
2,766
All Active Projects
1,131
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2022

November 21, 2022

img_map_placeholder

200 Thomas Run Rd, Bel Air, MD

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.