BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2022 at 8:00 PM

Updated January 29, 2024

This is a service / maintenance or supply contract in Beale AFB, California. Contact the soliciting agency for additional information.

Per the owner, as of April 21, 2022, this is a sources-sought solicitation for market research survey purposes and is not an actual solicitation. At this time, it is only a solicitation of interest. At this time, it is not known when an actual solicitation will be issued. Sources-sought solicitation is included below: Beale AFB request interest for installing new water well systems. This notice is for market research purposes only and no requirement exists at this time. The information furnished will assist Contracting in understanding the business environment and market capabilities. The below well systems could be agricultural and/or commercial. Major Work Elements Water Well Install new 6" water well with industry standard steel casing to a sufficient depth capable of maintaining approximately 10 gallons per minute (GPM) flow to an existing on-site storage tank and existing livestock water tank with non-potable water from the aquifer system below. Install drive shoe, conductor seal, new well pump and control system. Flow meter, water softener, and filtration are NOT required. Electrical Water well will be powered by an existing pole mounted transformer located across the street. Provide new power supply wires and route overhead to an existing wooden pole located adjacent to the existing storage tank. Provide transition down pole to underground. Provide new electrical disconnect located near the well or at power pole and trench new wiring as needed. Plumbing Reduce piping sizes on the 4-inch outlet from tank to 2-inch and replace the existing gate valve with a brass ball valve and match piping to existing connections. Install new 2-inch brass wye strainers inline on both outlets after the valves. Rearrange piping as needed. Modify piping to existing booster pump. Match reduced piping to existing booster pump piping. Provide valves and piping for a bypass of the booster pump. Bypass features shall be galvanized steel with brass valves, installed above grade. Above grade protective box to be modified as needed to accommodate bypass piping or replaced with new. Replace above ground portions of 1-inch booster pump piping with 1-inch galvanized streel piping Provide approximately 120-feet of flexible 1-inch piping, approved for direct burial, from the existing storage tank outlet under the road through an existing 4-inch steel pipe sleeve (piping from former well) to a location adjacent to the train tracks. Provide appropriately sized new piping from new well to existing pressure/storage tank. The method of contractor selection has not been determined at this time.

Conceptual

Water / Sewer

Public - Federal

Service, Maintenance and Supply

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
91
Bidding Soon
1,149
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

Project location map

Multiple Locations, Beale AFB, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.