BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, paving and new construction of a bridge / tunnel in Coquitlam, British Columbia. Conceptual plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.

This project will replace Walker Over Goat River Bridge No. 00615, located on Highway 3 approximately 12km east of Creston, BC (49 8'24.68", -11624'16.48"). The three span, ~87m structure built in 1950 comprises a ~55m steel through truss main span and accommodates 2 lanes of traffic. TIMELINE: Request for qualifications to short-list three qualified respondents is closed; preferred proponent is not selected. Detailed design to be complete Fall, 2023. Further update late summer 2023, upon approvals.

Conceptual

Bridges / Tunnels

$400,000.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
86
Bidding Soon
2,470
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.