BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Tacoma, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Description of Work: This contract provides for the resurfacing of: Group 1 - McCutcheon Road East (Canyon Falls Creek to Fennel Creek) (Base Bid) This work provides for resurfacing approximately 1.52 lane miles of McCutcheon Road East by resurfacing the roadway with Hot Mix Asphalt. Group 2 - Sumner Tapps Highway East (250' NE/O West Tapps Drive East to 16th Street East) (Additive Bid) This work provides for resurfacing approximately 1.2 lane miles of Sumner Tapps Highway East by resurfacing the roadway with Hot Mix Asphalt. Group 3 - C Street South (112th Street South to Park Avenue South) (Additive Bid) This work provides for resurfacing approximately 0.54 lane miles of C Street South by resurfacing the roadway with Hot Mix Asphalt. Group 4 - Park Avenue South (C Street South to Yakima Avenue South) (Additive Bid) This work provides for resurfacing approximately 2.49 lane miles of Park Avenue South by resurfacing the roadway with Hot Mix Asphalt. Group 5 - Yakima Avenue South (Park Avenue South to 96th Street South) (Additive Bid) This work provides for resurfacing approximately 0.33 lane miles of Yakima Avenue South by resurfacing the roadway with Hot Mix Asphalt. Group 6 - 120th Street East (300' E/O 198th Avenue East to South Prairie Road East) (Additive Bid) This work provides for resurfacing approximately 4.88 lane miles of 120th Street East by resurfacing the roadway with Hot Mix Asphalt. Group 7 - 152nd Street East (SR 161 to 250' E/O 118th Avenue Court East) (Additive Bid) This work provides for resurfacing approximately 2.78 lane miles of 152nd Street East by resurfacing the roadway with Hot Mix Asphalt. Group 8 -Waller Road East (72nd Street East to 400' S/O Pioneer Way East) (Additive Bid) This work provides for resurfacing approximately 5.1 lane miles of Waller Road East by resurfacing the roadway with Hot Mix Asphalt. Group 9 -Carbonado-Wilkeson Road (AP Tubbs Road East to Town Limits) (Additive Bid) This work provides for resurfacing approximately 0.4 lane miles of Carbonado-Wilkeson Road by resurfacing the roadway with Hot Mix Asphalt. and other work in accordance with and as described in the Plans and Specifications. Pierce County, in accordance with the provisions of Title VI of the Civil Rights Act of 1964, (78 Stat. 252, 42 U.S.C. 2000d to 2000d-4) and the Regulations, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Cost Range: $3,000,000 TO $5,000,000 Working Days: 85 and Utility Relocation Window Days: 0 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$3,651,563.00

Public - County

Paving, Site Work

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
26
Bidding Soon
672
All Active Projects
286
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2022

July 4, 2022

img_map_placeholder

Multiple Locations, Tacoma, WA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.