Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Joseph City, Arizona. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Tracs No: 040 NA 282 F0470 01C Project No: 040-D-NFA Termini: FLAGSTAFF - HOLBROOK HIGHWAY (I-40) Location: PERKINS VALLEY - HOLBROOK Route No. Milepost District Item No. I-40 282.80 to 290.30 NORTHEAST 102781 The amount programmed for this contract is $6,500,000. The proposed work is located in Navajo County on Interstate 40 between milepost 282.80 and 290.30 near Holbrook. The work consists of removing the existing asphaltic concrete surface course by milling and replacing it with a bonded wearing course (BWC) overlay. The project also includes spot repair work by milling and replacing it with asphaltic concrete and BWC. Additional work includes replacing pavement markings, loop detectors and other related work. The time allowed for the completion of the work included in this contract will be 70 working days. The Arizona Department of Transportation, in Accordance With the Provisions of Title Vi of the Civil Rights Act of 1964 (78 Stat. 252.42 U.s.c. 2000d-4) and the Regulations, Hereby Notifies All Bidders That It Will Affirmatively Ensure That Any Contract Entered Into Pursuant to This Advertisement, Disadvantaged Business Enterprises Will Be Afforded Full and Fair Opportunity to Submit Bids in Response to This Invitation and Will Not Be Discriminated Against on the Grounds of Race, Color, or National Origin in Consideration for an Award. The Minimum Contract-specified Goal for Participation by Disadvantaged Business Enterprises in the Work, as a Percentage of the Total Amount Bid, Shall Be 5.78. To Submit a Valid Bid, the Bidder Must (1) Have Prequalification From the Department as Necessary for the Project, and (2) Be Included on the Project Planholders List as a Prime. The Application for Contractor Prequalification May Be Obtained From the Contracts and Specifications Website. This Contract Is Subject to the Provisions of Arizona Revised Statutes Section 42-5075 -- Prime Contracting Classification; Exemptions; Definitions. No Award Will Be Made to Any Contractor Who Is Not a Duly Licensed Contractor in Accordance With Arizona Revised Statutes 32-1101 Through 32-1170.03. All Labor Employed on This Project Shall Be Paid in Accordance With the Minimum Wage Rates Shown in the General Wage Decision. These Rates Have Been Determined in Accordance With the Requirements of the Law and Issued by the Secretary of Labor for This Project. The Wage Scale Is on File in Contracts and Specifications Section and Copies May Be Obtained at All Reasonable Times. A Proposal Guaranty in the Form of Either a Certified or a Cashier's Check Made Payable to the State Treasurer of Arizona for Not Less Than 10 Percent of the Amount of the Bid or in the Form of a Surety (Bid) Bond for 10 Percent of the Amount of the Bid Shall Accompany the Proposal. Surety (Bid) Bonds Will Be Accepted Only on the Form Provided by the Department and Only From Corporate Sureties Authorized to Do Business in Arizona. Questions and Comments Concerning the Bid Package for This Project Shall Be Directed to the Individuals Noted Below: Iqbal Hossain, P.e. Group Manager Contracts & Specification AZDOT - Holbrook Highway (I-40) (Perkins Valley - Holbrook)
Award
Roads / Highways
$6,120,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 20, 2022
July 19, 2022
Purple Heart Trail, Joseph City, AZ
Related To This Project
Joseph City, AZ
Bid Date: Aug 23 2023
Joseph City, AZ
Bid Date: Feb 18 2022
Joseph City, AZ
Bid Date: Dec 16 2022
Joseph City, AZ
--
Joseph City, AZ
Bid Date: Dec 16 2022
Sedona, AZ
Bid Date: May 20 2022
Hereford, AZ
Bid Date: May 20 2022
Coolidge, AZ
Bid Date: May 06 2022
Williams, AZ
Bid Date: May 13 2022
Globe, AZ
Bid Date: May 06 2022
Tucson, AZ
Bid Date: May 23 2023
Surprise, AZ
Bid Date: Jun 22 2022
Phoenix, AZ
Bid Date: Apr 26 2022
Mesa, AZ
Bid Date: Apr 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.