BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

This is a service / maintenance or supply contract in Tampa, Florida. Contact the soliciting agency for additional information.

Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 07 Selection Method : Expanded Letter of Response Professional Liability Insurance : $500,000.00 CEI Hybrid Projects Managed by Tampa Operations - continuing TRC Members (Subject to Change) : Ghada Maghrebi Jonathan Gill Keilia Morton Financial Management Numbers : 41673326201 The goal of the Department's Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. 23704 - CEI Hybrid Projects Managed by Tampa Operations - continuing 23705 - CEI Hybrid Projects Managed by Pinellas Operations - continuing District Seven will be conducting Marketing Meetings on April 11, 2022 in the Flamingo Conference Room at the D7 Headquarters. These Marketing Meetings will include all Technical Review Committee members which are Keilia Morton, Ghada Maghrebi and Jonathan Gill. The meetings will begin at 2:00 PM and end at 4:00 PM. Each Consultant will have 30 minutes with the TRC members and will need to call and schedule the firms meeting time. These meetings are first come, first serve, therefore, scheduling early is suggested. Please call Keilia Morton at 813-975-6282 or e-mail to Keilia.morton@dot.state.fl.us to schedule your meeting. The firm ranked first will choose which Contract they will be awarded. 23704 - CEI Hybrid Projects Managed by Tampa Operations - continuing Maximum Contract Amount $5,000,000. 23705 - CEI Hybrid Projects Managed by Pinellas Operations - continuing Maximum Contract Amount $5,000,000. ************************************************************************************************************* Professional Liability Insurance (PLI) - $250,000 (23704 &23705) All questions of any nature regarding this advertisement, must be addressed to the Professional Services Unit staff, Contract Analyst, Pam Sherman 813-975-6656. Financial Management Number(s) 23704 FPN TBD 23705 FPN TBD Longlist Date/Time 5/10/2022 Shortlist Selection Date/Time 5/16/2022 Technical Review Committee Meeting 1 Date/Time 5/19/2022 Final Selection Date/Time 6/06/2022 07:00 pm Negotiations Period Begin Date 6/14/2022 Negotiations Period Ending Date 7/13/2022 The method of contractor selection has not been determined at this time. FDOT - RFP - CEI Hybrid Projects Managed by Tampa Operations - continuing

Conceptual

Roads / Highways

$10,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
115
Active Projects
67
Bidding Soon
1,283
All Active Projects
485
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 2, 2022

img_map_placeholder

Multiple Locations, Tampa, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.