Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an office development in Santa Barbara, California. Completed plans call for the renovation of a 3,220-square-foot office development.
Magnitude of construction: Between $100,000 to $250,000 SCOPE OF WORK: Provide all labor, materials, equipment, tools, field inspection, field verification, transportation, supervision, equipment start up services, permits, inspections, and other testing services necessary to replace the roof and repair interior damages in the Admin Bldg. at MSD Santa Barbara. The work includes, but is not limited to, the following: A. BASE WORK AT THE ADMIN BLDG, AND SHED ROOFS: 1) Provide operational testing and reports of all equipment to be temporarily relocated prior to demolition of roof and upon completion of work and re-installation of all equipment. COR shall be present for both tests. See Sheet T100. 2) Contractor shall obtain all required permits for work, including but not limited to, from the City of Santa Barbara. See Sheet T100. 3) Lock out/tag out of existing circuit breakers for an existing roof HVAC unit. Temporarily remove and store the HVAC unit and associated refrigerant piping and insulation. After the roof work is completed, install unit on existing curbs and reconnect all required existing electrical cables/wiring and existing refrigerant piping. Provide new piping insulation material for the existing refrigerant pipe. The thickness of insulation shall meet and exceed the ASHRAE 90.1-2019. Provide new high pressure treated wood blocks for the refrigerant piping. Provide equipment startup service and report. Coordinate removal of equipment with COR to minimize disruption to operation. Reinstall per manufacturer's guidelines. 4) Lock out/tag out of existing circuit breakers for the existing exhaust fan. Replace the existing exhaust fan and associated roof curb with new exhaust fan and roof curb. New exhaust fan shall match existing. Re-connect existing electrical power and exhaust duct to the new fan. Provide new backdraft damper to the new fan. Provide equipment startup service and report after completion of installation. 5) Lock out/tag out of existing circuit breakers for the existing 9348519 Page 2 roof split air conditioning (AC) unit. Temporary remove and store the AC unit and associated refrigerant piping and insulation. After the roof work is completed, provide new high pressure treated wood beams and install on the top of new roof. Re-install the existing AC unit on the new wood beams. Reconnect all required existing electrical cables/wiring and existing refrigerant piping. Provide new piping insulation material for the existing refrigerant pipe. The thickness of insulation shall meet and exceed the ASHRAE 90.1-2019. Provide new high pressure treated wood blocks for the refrigerant piping. Provide equipment startup service and report. 6) Temporarily remove the existing gas line prior to repairing the roof. Clean, paint, and re-install gas line with new high pressure treated wood blocks for gas line/pipe support to the roof after the roof work is completed. 7) Temporarily remove the existing condensate line prior to repairing the roof. Re-install the condensate line with bird deterrent spikes and new high pressure treated wood blocks for pipe support after the roof work is completed. 8) Temporarily remove remaining roof-mounted mechanical, electrical and communications equipment. Reinstall equipment as per drawing Sheet A100 & A102. 9) Tear off and dispose of existing roof system down to plywood deck including roof drains, downspouts and damaged flashing as shown on sheets A100 and A103, see Section 02 41 19. 4) Remove and dispose of existing metal coping and flashing as required to install new roofing at parapets. 5) Replace deteriorated plywood roof sheathing. Assume 400 SF. See Section 06 10 00. 6) Furnish and install new single ply roofing system engineered with 20 year leak free warranty including; insulation, cover board, flashings, and penetration accessories. 7) Furnish and install new parapet coping and flashing at both roofs. 8) Furnish and install new vent pipe boots. 9) Furnish and install new retrofit base flashing at all support members holding the equipment screen structure. Size to match existing supports. 10) Furnish and install new roof drains, scuppers, downspouts, 9348519 Page 3 heads and wire strainers to match existing openings. 11) Furnish and install new walking pad as noted on sheet A100 and section 07 54 23. Assume 400 LF. 12) Remove rust, prime and paint roof access ladder and hatch. B. BASE WORK INTERIOR AT THE ADMIN. BLDG.: 11) Remove and dispose of all water-damaged ceiling tiles in the locations indicated on the drawings. See Sheet A102. 12) Remove and dispose of all water-damaged batting insulation in the walls and ceilings. See Sheet A101. 13) Remove and dispose of all water-damaged and stained gypsum board at the walls. See Sheet A101. 14) Remove and dispose of all water-damaged and stained carpet and carpet padding, molding, and cover base at first and second floors. See Sheet A101. 15) Furnish and install new ceiling tiles in the locations indicated on the drawings. Assume 70 tiles at 2'X4'. See Sheet A102. 16) Furnish and install new batting insulation in the ceilings. Assume 600 SF. See Sheet A102. 17) Furnish and install new batting insulation in the walls. Assume 200 SF. See Sheet A101. 18) Furnish and install new gypsum board at the wall and paint wall to wall, ceiling to floor to match existing surfaces. Assume 200 SF. See Sheet A101. 19) Furnish and install new carpet and carpet padding, to match existing, and new coved wall base, and molding at the floors as per section 09 86 16. Assume 1,200 SF. of carpet and padding, 50 L.F. of molding, and 300 L.F. of coved wall base. See Sheet A101. 20) Remove stains from masonry walls and paint wall to wall, ceiling to floor to match existing surfaces. Assume 400 SF. See Sheet A101. 1.02 UNIT PRICE ITEM: Replacement shall be done per the Contracting Officer's authorization based on the unit price identified in the solicitation. Replacement costs shall include associated costs for demolition, new materials, installation, finishing and all 9348519 Page 4 other associated costs. Provide unit prices for replacement of the following: A. One SF of plywood sheathing in addition to the amount included in the base scope of work to be removed (400 SF). B. One SF of batting insulation in addition to the amount included in the base scope of work to be removed (400 SF). C. One unit of tegular smooth textured ceiling tile, 2'X4' in addition to the amount included in the base scope of work to be removed (70 Units). D. One SF of carpet and carpet padding in addition to the amount included in the base scope of work to be removed (1,200 SF). E. One LF of carpet molding in addition to the amount included in the base scope of work to be removed (50 LF). F. One LF of coved wall base in addition to the amount included in the base scope of work to be removed (300 LF). 1.03 LOCATION: Project site is located at MSD Santa Barbara, Santa Barbara, CA. 1.04 SITE INVESTIGATION: Investigate the site per FAR 52.236-3 to ascertain the general and local conditions which can affect the work or its cost. Contact Chief Maya Connell, CPO, or PO Nicholas Rhoades, PO2, at (805) 962-7430 to arrange site access.
Post-Bid
Office
$250,000.00
Public - Federal
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 29, 2022
May 30, 2022
111 Harbor Way, Santa Barbara, CA
Related To This Project
Santa Barbara, CA
--
Santa Barbara, CA
--
Santa Barbara, CA
--
Santa Barbara, CA
Bid Date: May 05 2022
Santa Barbara, CA
Bid Date: Mar 29 2022
Santa Barbara, CA
--
Santa Barbara, CA
--
Santa Barbara, CA
Bid Date: May 19 2022
Santa Barbara, CA
Bid Date: Apr 20 2022
Santa Barbara, CA
Bid Date: Feb 09 2022
Santa Barbara, CA
Bid Date: Apr 05 2022
Santa Barbara, CA
Bid Date: Apr 06 2022
Santa Barbara, CA
--
Santa Barbara, CA
Bid Date: Apr 19 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.