Published May 23, 2022 at 8:00 PM

Updated September 14, 2023

Demolition and site work for a civil project in Bastrop, Texas. Completed plans call for the demolition of a water / sewer project; and for site work for a water / sewer project.

Trunk Line 2 consisting of constructing approximately 3,827 linear feet of 36-in diameter gravity sanitary sewer line, manholes, highway bore, 10-in and 8-in diameter laterals, lift station demolition, and associated gravity sewer appurtenances. Interceptor 1 consisting of constructing approximately 3,421 linear feet of 24-in diameter gravity sanitary sewer line, 18-in diameter lateral, manholes, lift station demolition, and associated gravity sewer appurtenances. Liquidated Damages: $1,000.00 per day Construction Days: 270 days A CERTIFIED CHECK or an acceptable bid bond in an amount of not less than five percent (5%) of the total bid shall accompany each bid as a guaranty that, if awarded the contract, the bidder will promptly enter into contract with the City of Bastrop, and furnish bonds on the forms provided. BIDDERS are required to inspect the site of the work and to inform themselves of all local conditions and perform field measurements and geotechnical work, as needed. Final Completion shall be 300 calendar days including Saturdays, Sundays, and legal holidays. Substantial Completion shall be 270 calendar days. SCHEDULING Milestones and tie-in with other Contracts are required. Refer to Specifications 003100 COORDINATION AND MEETINGS. THE SUCCESSFUL BIDDER OR BIDDERS will be required to furnish a Performance Bond, Payment Bond, and Maintenance Bond as stipulated in the specifications. NO BID may be withdrawn after the scheduled closing time for receipt of bids for at least ninety (90) calendar days. THE CITY reserves the right to reject any and/or all bids, waive any and/or all formalities, and award the bid as it appears most beneficial to the City. Please submit questions for this project 72 hours prior to bid opening through website. Liquidated Damages : Contractor shall pay Owner $ 1,000.00 for each day

Bid Results

Water / Sewer

$4,485,944.00

Public - City

Demolition, Site Work

Subscribe For Documents

78 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Construction Progress Documentation, Photographic Documentation, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Sanitary Facilities, Temporary Construction, Vehicular Access and Parking, Traffic Control, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Field Engineering, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roof and Wall Specialties and Accessories, Roof Specialties, Reglets
Division 08 - Openings

Division 08 - Openings

Hardware
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 25 - Integrated Automation

Division 25 - Integrated Automation

Integrated Automation Facility Controls, Integrated Automation Control of HVAC
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors, Tunneling and Mining
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Pruning, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Plugging, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Operation and Maintenance of Sewer Utilities, Common Work Results for Utilities, Trenchless Utility Installation, Water Utilities, Water Utility Distribution Piping, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Dies and Molds, Molds
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
54
Bidding Soon
2,292
All Active Projects
799
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2022

July 18, 2022

img_map_placeholder

Multiple Locations, Bastrop, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.