Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2023 at 8:00 PM

Updated May 15, 2026

Site work for a water / sewer project in Stanley, Wisconsin. Completed plans call for site work for a water / sewer project.

In general the work consists of replacement of approximately 6,000 LF of heating hot water pipe and associated surface restoration. In general the work consists of approximately 4,900 LF of trenching, installation of heating hot water pipe (supply and return) and associated surface restoration. Base Bids will be received as follows: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. MBE (2%), WBE (12%)

Under Construction

Water / Sewer

$3,564,000.00

Public - State/Provincial

Site Work

76

15

5

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
63
Active Projects
12
Bidding Soon
477
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

May 15, 2023

Project location map

100 Corrections Dr, Stanley, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed