BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a playground / park / athletic field in Sturgeon Bay, Wisconsin. Conceptual plans call for site work for a playground / park / athletic field.

Plans call for the stabilization and revitalization of a lookout tower. As of August 12, 2022, the department of natural resources has made application to the state to bid this to architecture and engineering firms for design and construction administration. Although a firm construction timeline has not been established, construction is not expected to start before Q2 2023.

Conceptual

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
22
Bidding Soon
415
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 3, 2023

Project location map

3740 Park Dr, Sturgeon Bay, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.