BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a swimming pool in Winter Haven, Florida. Completed plans call for the renovation of a swimming pool.

Replace current high pressure sand filters for 50 meter x 25 yard pool. There are currently 3 high pressure sand filters. These are to be replaced with 2 horizontal high pressure sand filters with 80 sq. ft. of filter area per filter. Filters to have single lever backwash systems. This is to also include sand, diaphragms, and all components needed for installing the new filters. Contractor will be responsible for demolition and removal of old filtration systems, as well as installation of new filters and components associated with them. Flow rate for this pool must exceed 1,345 gallons per minute to meet the 4x turnover rate required by the Department of Health. B. Replace current high pressure sand filters for the Dive Pool. There are currently 2 high pressure sand filters. These are to be replaced with 1 single high pressure sand filters with at least 31 sq. ft. of filter area. Filter to have single lever backwash system. This is to also include sand, diaphragms, and all components needs for installing the new filters. Contractor will be responsible for demolition and removal of old filtration systems, as well as installation of new filters and components associated with them. Flow rate for this pool must exceed 574 gallons per minute to meet the 4x turnover rate required by the Department of Health. Replace a total of 3 (2 for 50 Meter Pool, 1 Dive well) recirculation pumps and motors. The motors used shall be VFD controlled, and produce flow ratings that exceed Florida Department of Health regulations for flow rate and turnover of each respective pool. This shall include replacement of strainer basket, pump, volute, impeller, motor, gaskets, seals, and all other components required for installation and operation. Contractor will be responsible for removal of old components, as well as installation of new. D. Replace plumbing from the motor to the filter, and from out of the filter to the heater regulation valve. All plumbing will be replaced with Sch. 40 PVC pipe, as well as proper fittings for Sch. 40 PVC. Contractor will be responsible for measuring lengths of pipe to be replaced during site visit. Contractor shall be responsible for removal of old pipe and fittings, as well as installation of new. E. Replace chemical controller for 50 Meter Pool and Dive Well. Controller to be replaced with equivalent of a BEC Sys5 chemical controller or better.

Post-Bid

Swimming Pools

$200,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
67
Bidding Soon
1,444
All Active Projects
582
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2022

June 17, 2022

img_map_placeholder

210 Cypress Gardens Blvd, Winter Haven, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.