Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Riverside, California. Contact the soliciting agency for additional information.
Per the owner, as of January 8, 2024, this solicitation has been awarded and the standards have been completed. Closed solicitation has been included below for reference. .......... Western Municipal Water District (Western) is requesting proposals from a qualified consulting and engineering firm, to develop SCADA standards and requirements based on industry standards, best practices, and the existing informal standards and preferences of Western. Western's SCADA Standards document will be a "living" document and will include HMI, PLC, and operational technology (network and computer system hardware/software) standards, SCADA management and maintenance procedures, and SCADA design requirements. The standards will allow Western to facilitate capital improvement project requirements and upgrade projects with efficient and consistent SCADA development. In 2018, Western completed a SCADA Master Plan. The SCADA Master Plan includes an Implementation Plan focused on a SCADA strategic plan that identifies SCADA component upgrades and system improvements for a cohesive, standardized, and optimized control system and to improve the overall SCADA system Reliability, Accessibility, Maintainability and Security (RAMS). The SCADA standards development is listed in phase one of the implementation plan. Western has the distinction of being both a wholesale and retail water provider. The wholesale division provides water and leadership to thirteen wholesale customers in a 527-square mile area of Riverside County. Nine of the wholesale customers receive imported water from Metropolitan Water District, as well as local water from the Arlington and Chino Desalters. The retail division provides water to businesses, industrial users, and more than 95,000 residents in three retail areas. Western's potable and recycled water system includes 128 pumps, 621 miles of pipeline ranging from 4 to 60 inches, and 38 water storage reservoirs. Western's wastewater system includes approximately 8,000 service connections, 24 lift stations and two wastewater treatment plants. This project will provide additional reliability to Western's operation and supports a proactive solution to maximize reliability. This scope covers the development of the highest priority sections of the Standards. The project may at the District's discretion, consist of additional phases which will be incorporated through future amendments to the agreement. Standards developed through this project include: SCADA HMI Standards SCADA PLC Standards SCADA Alarm Management Standards SCADA Historical Data and Reporting Standards SCADA Design Standards Operational Technology Standards Communications Standards Data Management Standards System Testing Standards Documentation Standards SCADA Project Delivery Online Q&A - Yes Q&A Deadline - 04/18/2022 5:00 PM (PDT) Project Schedule - This project shall be completed, and all final deliverables made, within 240 calendar days. This RFP does not commit Western to award a contract or pay any costs associated with the preparation of a proposal. Western reserves the right to reject any or all proposals and reserves the right to accept the proposal that is the most advantageous to Western regardless of proposal content. The method of contractor selection has not been determined at this time.
Award
Municipal
$300,000.00
Public - County
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
4
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2023
To Be Determined, Riverside, CA
Related To This Project
Riverside, CA
Bid Date: Mar 15 2022
Riverside, CA
Bid Date: Apr 26 2022
Riverside, CA
Bid Date: Apr 26 2022
Riverside, CA
Bid Date: Apr 29 2020
Riverside, CA
Bid Date: Sep 03 2019
Riverside, CA
Bid Date: Aug 22 2018
Riverside, CA
Bid Date: Nov 29 2018
Riverside, CA
Bid Date: Jul 18 2018
Riverside, CA
Bid Date: Apr 19 2022
Riverside, CA
--
Riverside, CA
Bid Date: Feb 10 2022
Riverside, CA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Try it free. The data you need to build the relationships you want.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.