Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Construction Variable Thickness Asphaltic Concrete Pavement, 7" Concrete Pavement, Variable Thickness Concrete Base, 6" Concrete Base, 7" Concrete Driveways, Sealing Pavement Joints and Cracks, Pavement Grinding/milling, Concrete Curb and Gutter, 5" Concrete Walk, Detectable Warning Field, Concrete Removals, Pavement Marking, Sewer Work, Water Work, Cuc, Trees Clearing and Grubbing, Etc.; Liquidated Damages, per diem: $1000.00/Day The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's The apprenticeship requirements for this project is: 0. If this contract is awarded at $500,000 or higher, 25% of all apprentice labor hours must be worked by apprentices certified for participation in the Residents Preference Program and 40% of all apprentice labor hours must be attributed to apprentices living in the following zip codes: 53204, 53205, 53206, 53208, 53210, 53212, 53215, and 53233 The contractor shall specifically note the SBE, residency, and apprenticeship forms for this project. If the forms are not filled out properly, it will be cause for rejection of the bid. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid. For those bids being submitted through Bid Express and using a manual Bond, the contractor may send a signed/executed copy of the bid bond to the Department of Public Works Contract Office by emailing DPWbids@milwaukee.gov. THE EMAILED COPY OF THE BOND MUST BE RECEIVED BY NO LATER THAN 10:30 A.M. ON THE SAME DATE THAT THE BIDS ARE DUE FOR THAT SPECIFIC OFFICIAL NOTICE, or the bid will be considered non-responsive. The original bid bond document must then be submitted by the contractor to the Department of Public Works Contract Office inperson or by mail to 841 N Broadway, Rm. 506, Milwaukee, WI 53202, immediately upon being notified that they are the apparent low bidder. Time for Completion: All work on project ST211060144 - North 23 rd Street, West Keefe Avenue to West Vienna Avenue shall be completed by August 26, 2022. No work can start at this location until after June 15, 2022. All work on project ST211150128 - West Concordia Avenue - North 20 th Street to North 22 nd Street - all work shall be completed by September 16, 2022. PAYROLL MONITORING REQUIREMENTS: The Prime Contractor awarded this project is required to participate in training on the City of Milwaukee's LCP Tracker Labor Compliance Software after the date of contract award. Throughout the contract term, Contractors are required to regularly provide timely payroll information via LCP Tracker. Please contact the DPW Contracts Office at 414-286- 3314 should you have any questions or concerns regarding the training or reporting process.
Award
Roads / Highways
$581,062.00
Public - City
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2022
June 6, 2022
Multiple Locations, Milwaukee, WI
Related To This Project
Jones Island Water Reclamation Facility, Buildings 204 Single Girder Crane Repairs - Rebid - 4174862
Milwaukee, WI
Bid Date: Apr 19 2022
Milwaukee, WI
Bid Date: Apr 26 2022
Milwaukee, WI
Bid Date: Apr 12 2022
Milwaukee, WI
Bid Date: Apr 14 2022
Milwaukee, WI
Bid Date: Apr 14 2022
Milwaukee, WI
Bid Date: Feb 14 2020
Milwaukee, WI
Bid Date: Mar 25 2022
Milwaukee, WI
Bid Date: Apr 08 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: May 06 2022
Milwaukee, WI
Bid Date: Apr 07 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 05 2022
Milwaukee, WI
Bid Date: May 10 2022
Milwaukee, WI
Bid Date: May 06 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.