BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and new construction of a mixed-use development in Ashland, Missouri. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

**As of June 17, 2022 , this project has not yet been awarded. The project is expected to be awarded on June 21, 2022.** **As of June 10, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** Federal Funds will be utilized in the development and construction of this project through the Missouri Department of Natural Resources (MoDNR) & Land & Water Conservation Fund (LWCF) and all relevant federal, state and local requirements apply. Certified MBE and WBE firms are encouraged to apply. The City of Ashland does not discriminate in its decisions on the basis of age, ancestry, color, disability, gender, gender identity, marital status, national origin, race, religion, sexual orientation, or on any other basis that would be in violation of any applicable federal, state. or local law. Furthermore, the City of Ashland will make reasonable accommodations for qualified individuals with known disabilities, unless doing so would result in an undue hardship. Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity Provide architectural design of building including; floor plan, elevation, foundation and finish schedule. The vendor shall be responsible for the install of the building and making sure the site is clean, so it is ready for walkways and any landscaping. The chosen vendor will supply two (2) copies of a maintenance manual with all possible cut sheets from all manufacturers furnishing products used in the new building that requires routine maintenance.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$75,105.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
27
Bidding Soon
327
All Active Projects
122
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 20, 2022

June 20, 2022

img_map_placeholder

399 N College St, Ashland, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.