EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 9, 2022 at 8:00 PM

Updated October 1, 2024

Site work, paving and outdoor lighting for a mixed-use development in Ocala, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

CT220525 Counties: Marion Road Name: Sr 40 and Us 441 Limits: At Sr 492 and From Sr 40 to Sr 40a (Sw Broadway) Project(s): 43366115201(*) Federal Aid No: D521017B Project(s): 43366115601 Federal Aid No: N/A Project(s): 44580015201 Federal Aid No: D522035B Total Roadway Length: 0.500 Miles Contract Days: 280 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.500 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: 120 Calendar Days 433661-1-52-01 - US 441. The project includes milling and resurfacing, median modifications, turn lane modifications, curb & gutter, drainage improvements, sidewalk, ADA improvements, traffic signal upgrades, signing and pavement markings, and utility relocations. 445800-1-52-01 - E SR 40 @ SR 492. This project includes replacing the existing two free-flow right turn lanes with a single right turn lane, upgrade the existing signals, add a new 7-ft buffered bicycle lane, crosswalks, and lighting. The project includes milling and resurfacing, curb & gutter, drainage improvements, sidewalk, ADA improvements, traffic signal upgrades, signing and pavement markings, lighting, and utility relocations For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 017 Traffic OPS Improvement/Milling and Resurfacing/Drainage Improvements

Award

Roads / Highways

$6,696,978.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Execution, Application
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 08 - Openings

Division 08 - Openings

Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Equipment, Domestic Water Filtration Equipment
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Trenching, Dewatering, Backfill, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
82
Bidding Soon
1,517
All Active Projects
665
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2022

July 25, 2022

img_map_placeholder

Multiple Locations, Ocala, FL

Related To This Project


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Traffic OPS Improvement/Milling and Resurfacing/Drainage Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.