Published October 25, 2022 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a medical facility in Vineland, New Jersey. Working plans call for the construction of a medical facility; and for site work for a medical facility.

Questions regarding the bid must be made via e-mail to Brian Nardone bnardone@theauthoritynj.com Subject: Bidding RFI For Rowan Medicine Vineland, Rowan University, Rowan College of South Jersey Cumberland Campus All questions must be received no later than 12:00 P.M. on Friday, August 5, 2022. Bids must be submitted on the standard Bid Proposal form provided by the Authority in the manner designated and must be enclosed in a sealed envelope bearing the title of the bid, name, and address of the Contractor on the outside; addressed to Cumberland County Improvement Authority, Rowan Medicine Vineland, Rowan University, Rowan College of South Jersey Cumberland Campus and delivered to the above address at the date and time set at the place herein. The Cumberland County Improvement Authority is not responsible for any hand delivered or third party delivered bids that do not arrive at the proper time or location. Any such bid will be returned unopened to the vendor. All documents contained in this package must be returned to the Cumberland County Improvement Authority in their original form. No substitutions, alterations, or modifications of any of the bid documents are permitted. The Cumberland County Improvement Authority requires that a Contractor submit with his/her bid, a bid guarantee in the form of a bid bond, certified check, or cashier's check in the amount of ten percent (10%) of the bid. In no case shall the bid guarantee exceed twenty thousand dollars ($20,000). Bid bonds shall be from a surety company licensed to do business in the State of New Jersey. Bonds that are signed by an Attorney-in-Fact shall be accompanied by a certified Power-of-Attorney. - Failure to include this item will mandate rejection of bid. The Contractor also will be required to submit performance security, in the form of a Performance Bond, in an amount equal to one hundred percent (100%) of the total value of the Contract. At the time of bid submission, all Contractors will be required to submit a Consent of Surety indicating that such surety will provide the Performance Bond if the Contractor is awarded a contract. No bid may be withdrawn for a period of sixty (60) days after the date set for the opening thereof. This bid is being solicited through fair and open process in accordance with the requirements of N.J.S.A. 19:44A-20.4, and shall be in conformance with the applicable requirements of the "Local Public Contracts Law," N.J.S.A. 40A:11-1 et seq. The Contractor will be required to comply with requirements of N.J.S.A. 10:2-1 (Anti-Discrimination in Employment), N.J.S.A. 10:5-31 et seq. and N.J.A.C.17:27 et seq. (Equal Employment Opportunity), 42 U.S.C. 12101 et seq. (Americans with Disabilities Act), N.J.S.A. 52:32-44 (New Jersey Business Registration), and N.J.S.A. 52:25-24.2 regarding the submission of a list of all Stockholders, Members or Partners owning more than ten percent (10%) stock or interest in their Corporation, Limited Liability Company or Partnership. All Contractors are placed on notice that they are required to comply with all requirements of P. L. 1975, Chapter 127 and N.J.A.C. 17:27. All Contractors and subcontractors must provide a copy of their State of New Jersey Business Registration Certificate issued by the New Jersey Department of Treasury prior to the time a contract is awarded or authorized. Contractors shall not submit bids with qualifying conditions or provisions. The owner reserves the right to consider the bids for sixty (60) days after receipt thereof, and further reserves the right to reject all bids, waive minor informalities, in accordance with applicable law. All Contractors are placed on notice that the Contractor receiving award for the contract will be required to execute the UPDATED Project Labor Agreement included in these bid documents as provided by the building trades as of May 2022. Pursuant to P.L. 2021, c. 301, all Contractors are hereby notified that which this contract is for a public work subject to the provisions at N.J.S.A. 34:11-56.25 et seq., the New Jersey Prevailing Wage Act (PWA), and accordingly, the person or entity who makes the lowest bid for the contract by at least 10 percent under the amount of the next lowest bid shall, prior to award of the contract, be required to certify to the public body on a form prescribed by the Commissioner of the Department (Commissioner) that the prevailing wage rates required by the PWA shall be paid in performing the work under the contract. Further, if this bidder does not provide the certification on the form prescribed by the Commissioner prior to the award of the contract, the Authority shall award the contract to the next lowest responsible and responsive bidder. ln order to encourage full participation in this opportunity, submit any requests for accommodations of people with disabilities to the Cumberland County Improvement Authority (856) 825-3700. People who are deaf, hard of hearing and/or speech impaired should access this service by contacting the NJ Relay Service at 1-800-852-7899-(TTY).

Final Planning

Medical

$6,890,000.00

Public - County

New Construction, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Assurance, Mockups, Temporary Facilities and Controls, Temporary Construction, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Final Cleaning, Starting and Adjusting, Closeout Submittals, Maintenance Data, Warranties, Project Record Documents, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Cold-Formed Metal Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Gypsum Sheathing, Shop-Fabricated Structural Wood, Finish Carpentry, Architectural Woodwork, Plastic Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Roofing and Siding Panels, Composite Roof Panels, Metal Wall Panels, Composite Wall Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Roof and Wall Specialties and Accessories, Roof Accessories, Roof Hatches, Fire and Smoke Protection, Applied Fireproofing, Joint Protection, Preformed Joint Seals, Joint Fillers, Joint Sealants
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Specialty Doors and Frames, Panel Doors, Entrances and Storefronts, Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Mirrors, Louvers and Vents, Louvers, Door Louvers, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Resilient Tile Flooring, Terrazzo Flooring, Carpeting, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Metal Lockers, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment, Commercial Equipment, Office Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Art, Window Treatments, Casework, Countertops, Furnishings and Accessories, Portable Lamps, Lamps, Furnishing Accessories, Clocks
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, Duct Insulation, Instrumentation and Control for HVAC, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, HVAC Fans, Air Terminal Units, Air Outlets and Inlets, HVAC Air Cleaning Devices, Central Heating Equipment, Breechings, Chimneys, and Stacks, Gas Vents, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Planting
Division 33 - Utilities

Division 33 - Utilities

Electrical Utilities, Electrical Utility Transmission and Distribution
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Hoists, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
223
Active Projects
140
Bidding Soon
1,896
All Active Projects
782
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 15, 2022

November 14, 2022

img_map_placeholder

3322 College Dr, Vineland, NJ

Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Rowan Medicine Building Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.