BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 10, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a playground / park / athletic field in Kent, Washington. Completed plans call for the construction of a playground / park / athletic field; and for site work for a playground / park / athletic field.

This project is a redevelopment of Kherson Park. The construction of the new park will include many new child friendly features to capture the imagination and historical ties to Kent's legacy in the aerospace industry. The new park will have interactive play features, a 40' image wall, picnic areas and video projection system. This project will also include some right of way improvements. Should a contract be executed, it is the contractor's responsibility to comply with all COVID-19 workplace health and safety measures established by the state Department of Labor & Industries or otherwise imposed by the Governor, the state Department of Health, or the Local Health Officer of Seattle-King County Public Health, or subsequent modifications to such health and safety measures as those authorities may issue, including providing all needed personal protective equipment. The Engineer's estimated range for this project is $950,000 - $1,150,000. For questions please email Michael Espenan MEspenan@kentwa.gov. The email Subject line should read "Kherson Park Bidder Inquiry." Michael can also be reached by phone at 253-856-5058. All questions must be received by 4:00 pm on May 5, 2022. Apprentice Utilization Requirements are mandatory for all public works estimated to cost one million dollars or more, in which case no less than 15% of the labor hours must be performed by apprentices. KCC 6.01.030. A cashier's check, cash or surety bond in the amount of 5% of the bid must be included with the bid. The City of Kent reserves the right to reject any and all bids on any or all schedules or alternates or to waive any informalities in the bidding and shall determine which bid or bidders is the most responsive, satisfactory and responsible bidder and shall be the sole judge thereof. No plea of mistake in the bid shall be available to the bidder for the recovery of his/her deposit or as a defense to any action based upon the neglect or refusal to execute a contract. Bidders must submit with their initial bid a signed statement as to whether they have previously performed work subject to the President's Executive Order No. 11246. No bidder may withdraw his/her bid for a period of sixty (60) days after the day of bid opening. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid-Result Schedule A Total Bid Amount Green Tech Excavation Inc-$1,452,000.00 Schedule B Total Bid Amount Green Tech Excavation Inc-$26,000.00

Bid Results

Playgrounds / Parks / Athletic Fields

$1,478,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
96
Bidding Soon
1,681
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2022

July 12, 2022

Project location map

307 W Gowe St, Kent, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.