BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2022 at 8:00 PM

Updated September 14, 2023

Site work for an educational facility in Saint-Lambert, Quebec. Completed plans call for site work for a educational facility.

Reference number : 1597487 Review Title : 048-048-42026 - École Préville - Renovation of the schoolyard phase 2 Deadline for receipt of complaints: 2022-05-03 Submission sent electronically accepted: Yes, in a single submission document The Center de services scolaire Marie-Victorin, owner, is requesting tenders for the repair work on the schoolyard - Phase 2 (Development of a play area with concrete border, drainage work, concrete slabs, addition picnic tables and a painting, relocated furniture, patching of asphalt, planting of trees and sodding). A virtual site visit is planned at École Préville, located at 139, rue d'Alsace, Saint-Lambert (Quebec) J4S 1M8. Tenders must be accompanied by a tender guarantee, which must correspond to ten percent (10%) of the amount of the tender, in the form of a certified check, a draft, an irrevocable letter of guarantee or of a bond. The bid bond must be issued by a Financial Institution that is an insurer holding a license issued in accordance with the Insurance Act (RSQ, cA-32) authorizing it to practice suretyship insurance, a trust company holding a license issued under the Act respecting trust companies and savings companies (RSQ, c. S-29.01), a financial services cooperative covered by the Act respecting financial services cooperatives(RSQ, c. C-67.3) or a bank within the meaning of the Bank Act (SC, 1991, c.46). When the bid security is in the form of a bond, it must be accompanied by a letter of undertaking issued by the issuer of the bond stipulating that a performance bond and a bond of obligations for wages, materials and services will be awarded to the successful bidder. When guarantees are in the form of security, the amount of each of them corresponds to fifty percent (50%) of the contract price. When the guarantee is in the form of a certified check or a draft, the bid guarantee must be issued in favor of the Center de services scolaire. This bid security may be exchanged no later than fifteen (15) days after the letter of award is sent for a performance bond and a bond for wages, materials and services, the amount of each corresponds to fifty percent (50%) of the contract price. The Center de services scolaire Marie-Victorin does not undertake to accept any of the submissions received. Note: tender documents can only be obtained through the electronic tendering system . Beginning of the roadworks June 27, 2022 Provisional acceptance of the work August 26, 2022 End of the works September 26, 2022 award is subject to final approval

Award

Educational

$183,900.00

Public - State/Provincial

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
357
Active Projects
165
Bidding Soon
2,511
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

June 27, 2022

Project location map

139 Av. d'Alsace, Saint-Lambert, QC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.