BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a road / highway in Milwaukee, Wisconsin. Conceptual plans call for outdoor lighting for a road / highway.

As of July 5, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2023. *The closed solicitation has been included below for reference: The Department of Public Works (DPW), is soliciting a Request for Proposal (RFP) for qualified consulting firms to provide Series to Multiple Street Lighting Conversion-American Rescue Plan Act. All requests for clarification regarding the RFP and the selection process must be submitted in writing by 4:00P.M. (CDT), May 13, 2022 to: Mr. Rollin Bertran, P.E. Engineer in Charge 841 North Broadway, Room 701 Milwaukee, Wisconsin 53202 Questions/answers and any other items will be provided in an addendum to be sent to all RFP holders and posted by May 13, 2022. Only written responses and/or addenda will be binding upon the City. There are no SMWBE/LSA requirements for this project. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) website at https://milwaukee.diversitycompliance.com. If there are any questions regarding SBE firms, please contact the OEI at 414-286-5553. The Commissioner of Public Works reserves the right to reject any and all proposals and accept only such proposals as is in the best interest of the City of Milwaukee. The method of Contractor Selection has not been Determined at this time. Anticipated Construction Cost: $7.5M and $8.5M *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Roads / Highways

$8,500,000.00

Public - City

Outdoor Lighting, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
59
Bidding Soon
1,064
All Active Projects
456
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2023

img_map_placeholder

Multiple Locations, Milwaukee, WI


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.