Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and renovation of a civil project in Arena, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; for the demolition of a water / sewer project; and for the renovation of a water / sewer project.
Work for which bids are asked consists of two proposals. Interested bidders may submit bids on one or both proposals. Proposal A work includes approximately 1,900 linear feet 8-inch sanitary sewer, 7 manholes, 500 feet of C900 water main and roadway restoration consisting of aggregate base and asphaltic concrete pavement. Work also includes utility appurtenances, dewatering, railroad utility pipe jacking and turf restoration. Lift station work includes demolition/abandonment of the South Street Lift Station and upgrades to the existing Pine Street Lift Station including new submersible pumps, process piping, natural gas fueled standby generator with automatic transfer switch, power distribution junction box, natural gas supply and appurtenances, control panel retrofit and related equipment. Proposal B work includes approximately 5,000 linear of 8-inch resin impregnated cured-in-place (CIPP) pipe lining, reinstate and grout and 60 service laterals, install new castings, adjustment and external chimney seals on 14 manholes and grout seal joints in 10 precast manholes. If the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Andy Zimmer, 1230 South Boulevard, Baraboo, WI 53913. The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The minimum wages to be paid on the project shall be in accordance with Federal Davis Bacon Wage Rates. Federal wage rates can be found website. Be aware that project Administrators, Bidders, and Contractors are required to use the latest federal wage rate available at the time of bid opening. This project anticipates use of Wisconsin DNR Clean Water Fund Program funding. We encourage Disadvantaged Business Enterprises (DBEs), including Minority-owned Business Enterprises (MBEs), and Women's Business Enterprises (WBEs) to submit bid proposals. A municipality, in awarding prime contracts, and the primary engineer and primary contractor. Utilization in accordance with s.NR 162.09(3), s.NR 166.12(4), and s.NR 167.18(4) Wis. Admin. Code. If a subcontractor awards subcontracts, these requirements shall apply to the subcontractor. The Contractor shall conform to the "Use of American Iron and Steel" provision of H.R. 3547 Consolidated Appropriations Act, 2014, section 436, including all iron and steel products used in the project. Bid Proposals may be denied if the requirements of this section are not met and waivers are required. EPA guidance for the use of American Iron and Steel (AIS) can be found at website. OWNER reserves the right to waive any informalities or to reject any or all bids.
Award
Water / Sewer
$173,069.00
Public - City
Demolition, Paving, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 2, 2022
July 4, 2022
Multiple Locations, Arena, WI
Related To This Project
Arena, WI
Bid Date: Jan 11 2023
Arena, WI
Bid Date: Jan 26 2023
Arena, WI
Bid Date: Jan 26 2023
Arena, WI
Bid Date: Nov 02 2021
Arena, WI
Bid Date: Jun 03 2024
Arena, WI
Bid Date: Sep 22 2022
Madison, WI
Bid Date: Jul 20 2022
Oshkosh, WI
Bid Date: Jul 20 2022
Milwaukee, WI
Bid Date: Jul 15 2022
Milwaukee, WI
--
Milwaukee, WI
--
Milwaukee, WI
--
Green Bay, WI
Bid Date: Jul 19 2022
Wausau, WI
--
Baraboo, WI
Bid Date: May 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.