Site work and paving for a mixed-use development in Pewaukee, Wisconsin. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project: 050-0334-22, SW-22-12804, RD-22-57407, ST-22-57333,, ST-22-57301 Project Category Code: Sanitary Sewer (Gravity), Landscaping (Tree and Shrub Clearing), Landscaping (Tree Trimming/Cutting), Culverts, Waterways, Stormwater Channels, Tree Cutting, Drainage, Dredging, Ditches and Canals, Street/Road Asphalt Resurfacing and Milling, Fittings and Valves, Fire Hydrant, Grade and Surface, Pavement Resurface and Rehabilitation, Asphalt Pulverizing, Landscaping, Stormwater Improvements, Street/Road Materials, Erosion Control - Temporary, Paving (Asphalt or Concrete), Storm Drain and Paving, Televising Sewers, Street/Roadway Reconstruction , Asphalt Overlay, Rehab. and/or Maint., Utility Street Construction and Excavation, Sewer and Water Construction, Sitework/Excavating and Grading, Water/Wastewater Infrastructure, Grubbing & Clearing, Waterlines, Paving (Highway, Road or Street) Description: The Shady Lane and Shady Nook Road Reconstruction project involves 1,800 tons of asphaltic concrete, 2,500 L.F. of 8-inch sanitary sewer installation, 13 each sanitary manholes, 710 L.F. of sanitary laterals, 2,500 L.F. of 8-inch water main installation, 21 water services, 3,100 L.F. of ditching, erosion control, restoration, and traffic control. The Hill N Dale Drainage Improvements project involves 6 acres of clearing and grubbing, 14,000 cubic yards of pond clay liner, 1 lump sum for wet pond excavating and grading, 1,830 L.F. ditching, 150 L.F. of culvert installation, traffic control, erosion control, and restoration. Additonal Description: All Work is included in multiple prime contracts. Bidding Documents, including Drawings and Specifications, may be examined at the offices of the City of Pewaukee, and the Consulting Engineer during regular business hours. Construction time is of the essence. Completion delays are subject to liquidated damages. The City of Pewaukee reserves the right to accept the most advantageous Bid, or to reject any and all Bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Pre-Bid Meeting Info: No Pre-bid meeting will be held. PROJECT # SW-22-12804 PROJECT # RD-22-57407 PROJECT # ST-22-57333 PROJECT # ST-22-57301 PSI understands that Project No. 4 of the proposed Pewaukee 2016 Roads Projects includes the rehabilitation/reconstruction of various roadways located within the Hill N Dale Area, in Pewaukee, Wisconsin. The roadways will include Hill N Dale Circle, Shady Lane, and Shady Nook Court. From the information provided by the client, if sanitary sewer and water main utilities are not constructed, it is understood that the road reconstruction will consist of pulverizing the existing asphalt in place, and placing a new asphalt pavement section over the existing base course and asphalt millings. Pulverizing and repaving will also include spot base repairs as needed. However, if the proposed sanitary sewer and water main utilities are constructed, it is understood that the project will consist of removal and replacement of the existing pavement materials (asphalt and base) in their entirety. Some ditch work will be performed for each method of reconstruction. The details of the of the ditch work were not provided, however it is anticipated that it will consist of reshaping, widening, or deepening the existing ditches to enhance drainage. PSI anticipates the finished elevations of the roadway surface will be at or near existing grade for the proposed reconstruction.

Bid Results

Roads / Highways

$3,164,830.00

Public - City

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
126
Active Projects
76
Bidding Soon
1,305
All Active Projects
523
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

July 18, 2022

img_map_placeholder

Multiple Locations, Pewaukee, WI

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.