Published March 21, 2023 at 8:00 PM

Updated October 1, 2024

Demolition, site work, renovation and addition to an educational facility in Chicora, Pennsylvania. Completed plans call for the addition of a educational facility; for the demolition of a educational facility; for the renovation of a educational facility; and for site work for a educational facility.

Award General Construction - Vendrick Construction $14,372,200 Architectural Casework Construction - Northeast Interior Systems - $839,000 Food Service Equipment - Brekenridge Kitchen - $601,500 HVAC Construction - Lugaila Mechanical - $3,631,000 Plumbing Construction - Vrabel Plumbing $2,007,400 Electrical Construction - Right Electric $3,120,600 Bids shall be submitted in sealed envelopes bearing the name of the Bidder and shall be clearly marked Chicora Elementary School Additions & Renovations. Bids will be publicly opened and read aloud immediately after the scheduled closing time for receipt of Bids. Bids received after the abovereferenced date and time shall be returned to the Bidder unopened. Separate, sealed Bids will be received for the following Prime Contracts: 3325-1 General Construction 3325-2 Heating, Ventilating and Air Conditioning Construction 3325-3 Plumbing Construction 3325-4 Electrical Construction Bidding document questions shall be directed to Crabtree, Rohrbaugh & Associates, Attention: Bidding Department, email: bidding@cra-architects.com. All questions pertaining to the Contract Documents, technical sections, legal documents, and bid submission shall be directed in writing to: Anthony Colestock, Senior Project Manager, email: acolestock@cra-architects.com Each bid shall be accompanied by bid security in an amount equal to ten percent (10%) of the Base Bid amount and all alternate bid amounts in the form of a Bid Bond as described in the Supplementary Instructions to Bidders. A Performance Bond and a Payment Bond in the forms provided in the Project Manual, each in an amount equal to one hundred percent (100%) of the amount of the Contract, and each with satisfactory corporate surety, must be furnished by the successful Bidder prior to execution of a Contract. Bids may not be modified, withdrawn or cancelled by the Bidder for sixty (60) calendar days following the actual date of opening thereof, except as provided by the Commonwealth Procurement Code. However, if award of Contract is delayed by the required approval of another government agency, the sale of bonds or the award of a grant or grants, Bids may not be withdrawn by the Bidder for a period not to exceed 120 days from the date of bid opening in accordance with Pennsylvania law. The School District is requesting bids to be made "net of insurance" and will award the contract to the lowest responsible bidder "net of insurance," all as more thoroughly described in the Contract Documents. Under this approach, Contractors and Subcontractors must remove the cost of Owner provided insurance from the Base Bid price. The lowest responsible bidder will be determined on a "net of insurance" basis. In other words, the Base Bid is to be identified by the Contractor excluding costs and expenses for General Liability, Umbrella/Excess Liability, Workers' Compensation, and Builder's Risk Insurance as delineated in the contract documents. Alternate Bids and Unit Prices are also to be set forth excluding cost for such insurance. The Owner will select which alternates it desires and will determine the low bidder based upon the bids without insurance being provided by the Contractor. Karns City Area School District reserves the right in its sole discretion to reject any or all Bids and to waive irregularities in any Bid. Further, Karns City Area School District reserves the right to award any combination of Alternates, or no Alternates, which in its sole discretion, serves the best interests of the School District This project is subject to the Davis-Bacon Prevailing Wage Rates. Corporations seeking to bid which are organized under the laws of a State other than Pennsylvania must secure the appropriate certificate, authorizing them to conduct business within the Commonwealth. Project Number: 2020163 Bid Result : General Construction - Vendrick Construction, Inc - $ 14,087,000.00 Heating, Ventilating and Air Conditioning Construction - Lugalia Mechanical - 3635000 Plumbing Construction - Vrabel Plumbing Company, LLC - $ 2,080,200.00 Electrical Construction - Right Electric - $ 3,177,700.00

Award

Educational

$24,571,700.00

Public - City

Addition, Demolition, Renovation, Site Work

1

1

23

4

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Project Management and Coordination, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Manufacturer?s Field Services, Mockups, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Temporary Construction, Temporary Barriers and Enclosures, Temporary Fencing, Temporary Controls, Temporary Erosion and Sediment Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Maintenance Data, Bonds, Warranties, Project Record Documents, Demonstration and Training, Commissioning, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Existing Conditions, Demolition, Building Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete, Cast Decks and Underlayment, Cast Underlayment, Hydraulic Cement Underlayment
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Metal Decking, Steel Decking, Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Underlayment, Finish Carpentry, Architectural Woodwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Thermal Protection, Steep Slope Roofing, Natural Roof Coverings, Roofing and Siding Panels, Composite Wall Panels, Membrane Roofing, Flashing and Sheet Metal, Sheet Metal Roofing, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Applied Fireproofing, Firestopping, Joint Protection, Expansion Control
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Access Doors and Panels, Panel Doors, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Roof Windows and Skylights, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents, Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Lath, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Wood Flooring, Resilient Flooring, Terrazzo Flooring, Carpeting, Wall Finishes, Special Wall Surfacing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Partitions, Wall and Door Protection, Toilet, Bath, and Laundry Accessories, Storage Specialties, Lockers, Plastic Lockers, Storage Assemblies, Exterior Specialties, Protective Covers, Other Specialties, Pest Control Devices
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment, Educational and Scientific Equipment, Audio-Video Equipment, Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Furniture, Residential Furniture, Beds, Multiple Seating
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators, Lifts, Scaffolding
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Fire Suppression, Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Facility Storm Drainage, Facility Storm Drainage Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Identification for HVAC Piping and Equipment, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Pneumatic and Electric Control System for HVAC, Sequence of Operations for HVAC Controls, Facility Fuel Systems, Facility Fuel Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Piping, Hydronic Pumps, Refrigerant Piping, Refrigerants, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Flexible Connectors, HVAC Fans, Air Outlets and Inlets, Central Heating Equipment, Heating Boilers, Condensing Boilers, Central Cooling Equipment, Refrigerant Compressors, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Control-Voltage Electrical Power Cables, Grounding and Bonding for Electrical Systems, Overcurrent Protective Device Coordination Study, Commissioning of Electrical Systems, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Switchboards and Panelboards, Switchboards, Panelboards, Low-Voltage Circuit Protective Devices, Fuses, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Electrical and Cathodic Protection, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Distributed Communications and Monitoring Systems, Distributed Systems, Clock Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Mowing, Pruning, Bases, Ballasts, and Paving, Base Courses, Aggregate Base Courses, Curbs and Gutters, Concrete Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations, Site Grounding, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Cranes, Lifting Devices, Clamps, Lifts, Manufacturing Equipment, Dies and Molds, Molds
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Gas Handling Equipment, Gas Compressors, Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
117
Bidding Soon
942
All Active Projects
434
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 10, 2023

March 11, 2023

img_map_placeholder

205 Kittanning St, Chicora, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Additions and Renovations to Chicora Elementary School

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.