BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Deland, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of January 18, 2023, information regarding the award and award date has not been disclosed. A firm timeline for construction has not been established. *The closed solicitation has been included below for reference: SR 953/LeJeune Road/NW 42nd Ave from North of NW 103rd St. Selection Method : Letter of Response and Oral Presentation Professional Liability Insurance : $250,000.00 Financial Management Numbers : 44780313201 44780313202 TRC Members (Subject to Change) : Alexandre Gutierrez Kira Leon Omar Mendoza Lavin CSC for Safety Technical Support and Public Outreach RRR Project along SR 953/LeJeune Road/NW 42nd Avenue from North of NW 103rd Street to South of NW 135th Street. Project improvements include: milling and resurfacing of existing roadway pavement, removing abandoned driveways, reconstructing curb and gutter, updating existing deficient pedestrian features such as sidewalks, pedestrian curb ramps, detectable warning surfaces, pedestrian detector assemblies, pedestrian crossing signs and plaques, upgrading/providing pedestrian control signals. Improvements also include signing and pavement markings, signalization, lighting; as well as bridge related scope items such as replacement of bridge deck expansion joints and provision of tapered-end transitions for bullet railings at bridge approaches. Coordination with Miami-Dade Transit Authority is expected for boarding and alighting areas, signs, and benches . Existing drainage system must be evaluated as some areas as susceptible to ponding. Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Forms, Org Chart or Staffing Chart, Resumes Due Date: Tuesday, June 21, 2022 Tentative Technical Proposal Due Date: Tuesday, June 21, 2022 Longlist Date/Time 5/24/2022 Shortlist Selection Date/Time 6/06/2022 Phase II Submittal Deadline Date/Time 6/22/2022 Final Selection Date/Time 7/11/2022 Negotiations Period Begin Date 7/19/2022 Negotiations Period Ending Date 9/01/2022 FLDOT - RFP Engineering - SR 953/LeJeune Road/NW 42nd Ave from North of NW 103rd St

Conceptual

Roads / Highways

$5,429,334.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
68
Bidding Soon
1,271
All Active Projects
559
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.