BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

This is a service / maintenance or supply contract in San Diego, California. Contact the soliciting agency for additional information.

PIPELINE Work will include a variety of detailed repair and construction tasks and specifications that have pre-established unit prices listed in a Unit Price Book (UPB). The UPB pricing incorporates the use of experienced labor, high quality materials, local activity, climate, and geographic factors. All Work pursuant to this Contract will be performed for the City of San Diego. The Work will involve the repair, alteration, modernization, maintenance, rehabilitation, reconstruction, or construction of City streets, utilities and other Right of Way Pipeline included in a JOC Task Order RFP. 1.1. The Contractor shall furnish all management, documentation, design, and incidental drawings (as required), labor, materials, and equipment needed to perform the Work. 1.2. The Work shall be performed in accordance with the JOC Task Order RFP Scope of Work and other requirements. Other Details 1.9. Contractor and Subcontractor Registration Requirements. This project is subject to compliance monitoring and enforcement by the DIR. A contractor or subcontractor shall not be qualified to bid on, be listed in a bid or proposal, subject to the requirements of section 4104 of the Public Contract Code, or engage in the performance of any contract for public work, unless currently registered and qualified to perform public work pursuant to Labor Code section 1725.5 It is not a violation of this section for an unregistered contractor to submit a bid that is authorized by Section 7029.1 of the Business and Professions code or by Section 10164 or 20103.5 of the Public Contract Code, provided the contractor is registered to perform public work pursuant to Section 1725.5 at the time the contract is awarded. 1.9.1. A Contractor's inadvertent error in listing a subcontractor who is not registered pursuant to Labor Code section 1725.5 in response to a solicitation shall not be grounds for filing a bid protest or grounds for considering the bid nonresponsive provided that any of the following apply: (1) the subcontractor is registered prior to bid opening; (2) within twenty-four hours after the bid opening, the subcontractor is registered and has paid the penalty registration fee specified in Labor Code section 1725.5; or (3) the subcontractor is replaced by another registered subcontractor pursuant to Public Contract Code section 4107. 1.9.2. By submitting a bid or proposal to the City, Contractor is certifying that he or she has verified that all subcontractors used on this public work project are registered with the DIR in compliance with Labor Code sections 1771.1 and 1725.5, and Contractor shall provide proof of registration for themselves and all listed subcontractors to the City at the time of bid or proposal due date or upon request. 25. SUBCONTRACTING PARTICIPATION PERCENTAGES: 25.1. The City has incorporated a voluntary mandatory subcontractor participation percentage to enhance competition and maximize subcontracting opportunities. 25.2. The mandatory subcontracting percentage is 10% for SLBE-ELBE firms, unless specified otherwise by the Task Order RFP. 25.3. Task Order costs, without Field Order amounts, will be included in the calculation. 25.4. The Contractor shall maintain a participation level at or above the mandatory percentage continuously throughout the term of the contract. 25.5. The Contractor shall submit as requested, during the term of the contract, a subcontractor participation report as required by the City detailing the participation levels for each certification and overall by each Task Order and overall contract Project Duration 2 years for issuance of Task Orders The Contract Term is two (2) years from the time of JOC Award for the issuance of fully executed Task Order Authorizations. All work pursuant to any Task Order issued shall be completed within the time frame specified on the Task Order Notice to Proceed. The total time for the issuance of Task Orders and completion of the associated Work shall not exceed five (5) years Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Online Q&A No The City reserves the right to reject any or all Bids, to waive any informality or technicality in Bids received, and to waive any requirements of these specifications as to Bidding procedure.

Post-Bid

Water / Sewer

$40,000,000.00

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2022

July 11, 2022

img_map_placeholder

Multiple Locations, San Diego, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.