BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an elderly care / assisted living facility in Barrhead, Alberta. Completed plans call for the renovation of a elderly care / assisted living facility.

Responsibilities of Contractor which is not limited to following: 1) Conduct site review to verify existing conditions. Acquire contact for monitoring and local fire department. Determine all auxiliary functions from existing system, label all field wiring at panel for reference. Photograph existing wiring and terminations for record. Test field wiring to determine absence of ground fault and continuity of wiring for initiating and alarm circuits. Verify all circuits and devices have integral ground wire or means to achieve ground at each device location. 2) Apply and pay for electrical permit. 3) Order fire alarm package, provide shop drawings, submit to owner and engineer for review and approval prior to order. 4) Mobilize lay down area for storage of new equipment / existing equipment to be removed. 5) Accept delivery and account for all new fire alarm panels, devices and equipment. 6) Upon receipt of all fire alarm equipment, prepare schedule for fire alarm replacement. Communicate dates with owner. Arrange for all fire watch during time of interruption of service. Arrange for access to suites through owner, allow 24 hour notice minimum. Coordinate access time for elevator hoisting and machine room devices. Provide notice of elevation service interruption. 7) Provide x-ray for any coring in concrete floors or walls prior to construction. 8) Coordinate with elevator supply company regarding elevator homing feasibility and termination points of field wiring. 9) If generator power is present in building, allow for determination of generator tie in points for generator run and generator fail supervisory contacts on fire alarm panel. 10) Investigate the existing means of mechanical shutdown of ventilation units. Confirm wiring does not impact original manufacture's wiring ULC and CSA designations. 11) Conduct panel replacement in a systematic fashion such that zones may be transferred systematically without losing service and protection to any part of the building outside of controlled fire watch. 12) Replace all initiating devices. Verify field wiring is trouble free and ground fault free prior to proceeding to subsequent zones. 13) Replace all notification devices. Verify field wiring is trouble free and ground fault free prior to proceeding to subsequent zones. 14) Supply and install all access doors shown on plans or as needed to facilitate wiring and system installation. Provide fire rated access doors where installation in fire rated ceilings. 15) Provide ULC approved fire stop sealant for all new wiring penetrations through fire rated assemblies. This includes floor to floor, hallway to suite or suite to suite wiring runs. 16) Reconnect all auxiliary functions and system monitoring upon completion. a. MUA shutdown on duct smoke alarm b. Supervisory alarm on sprinkler system tamper. Fire alarm on sprinkler system flow. Rewire of sprinkler devices to achieve supervisory alarm via closed contacts. 17) Conduct pre-verification of to compile device list, complete with address location, verify single stage operation for piezos/strobes and horn/strobes. 18) If fire shutters and/or fire doors are present, confirm correct operation prior to final verification. 19) Coordinate sprinkler tie in with sprinkler contractor, including access to wiring and terminations. Sprinkler contractor to be present for flow timing calibration and at time of verification for final flow and tamper testing of fire alarm sprinkler devices. Confirm sprinkler tampers annunciate as supervisory alarm, flow switches annunciate as alarm. 20) Monitoring to be connected. ULC listing to be confirmed. Verify trouble, alarm and supervisory are correctly received by monitoring agency. 21) Provide final as-builts and request final inspection from electrical permit authority. 22) Schedule fire alarm verification with engineer and owner. 23) Provide all finishing drywall and paint repair at panel locations. 24) Provide cleanup and disposal of all existing fire alarm equipment

Award

Elderly Care / Assisted Living

$38,950.00

Public - City

Renovation

6

8

4

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
13
Active Projects
7
Bidding Soon
205
All Active Projects
71
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2022

June 14, 2022

img_map_placeholder

5127 47 St, Barrhead, AB


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.