BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and renovation of a mixed-use development in Glade Park, Colorado. Completed plans call for the renovation of a playground / park / athletic field; for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Award Details Contract Award Date: Aug 18, 2022 Contract Award Number: 140L1722C0007 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: VJGWLNQGLCP9 Contractor Awarded Name: FORRESTER & ASSOCIATES LLC Contractor Awarded Address: Ackerman, MS 39735-9708 USA Base and All Options Value (Total Contract Value): $804988.65 Summary of Work: Furnishing labor, equipment, supplies, and materials, for the demolition and disposal and/or salvage of items within an existing campground including but not limited to the removal of precast concrete toilet buildings/vaults, buried water tanks and items associated with a water system, tables, fire rings, fencing, and miscellaneous isolated items. Work also includes to the installation of new precast concrete toilet buildings, buried water tank and water system, tables and fire rings, post and cable fencing, boulder retaining walls and individual boulder placement, construction of parking areas and picnic areas, placing crushed aggregate surfacing onto prepared roadways and parking areas, constructing concrete parking areas and walkways, and other miscellaneous work associated with a campground. Project Location: Mud Springs Campground, Glade Park, Colorado Estimated Period of Performance: 6 Sep 2022 - 26 May 2023 Rough Order of Magnitude: Between $500,000 and $1,000,000 BLM-CO - Mud Springs Campground Improvements This is a solicitation for proposals for the work described below and in the attachments. The Government is conducting a competitive acquisition for this requirement for a Firm Fixed Price contract on a Low Price Technically Acceptable basis. Work will not begin until after Labor Day, but we would want the awardee to order long lead time supplies as early as possible. Basic Contracting Requirements: 1. Active Registration www.sam.gov 2. Invoicing and Payment www.ipp.gov 14 day prompt pay 3. FAR Part 36 Provisions and Clauses 4. FAR PAR 15 Contracting by Negotiation 5. Davis Bacon Act Wages for Mesa County, CO 6. Bid, Performance, and Payment Bonding 7. Total Small Business Set Aside for NAICS 237990 Size Std: $39.5M 8. Award Basis Low Price Technically Acceptable Minimum Requirements for a Responsive Proposal 1. Filled out, signed, dated SF1442 with all amendments acknowledged. 2. Schedule B and Schedule B Worksheet with all prices filled in (may be attached to the SF1442. 3. Bid Bond 20% of the proposed price 4. Technical Proposal See Section L for contents 5. Email all items above to the POC no later than the closing date. POC: Contracting Specialist and Admin Officer Robert Hall - rhall@blm.gov - 970-876-9038 POC: Contracting Officer David Thomas - dethomas@blm.gov - (303) 239-3637 PM/COR: Civil Engineer Blaine Vecchia - bvecchia@blm.gov - (970) 244-3185 - 9705496536 Period of Performance: 09/06/2022 to 05/26/2023 SCOPE OF WORK SUMMARY A. Description of Work: Furnishing labor, equipment, supplies, and materials, for the demolition and disposal and/or salvage of items within an existing campground including but not limited to the removal of precast concrete toilet buildings/vaults, buried water tanks and items associated with a water system, tables, fire rings, fencing, and miscellaneous isolated items. Work also includes the installation of new precast concrete toilet buildings, buried water tank and water system, tables and fire rings, post and cable fencing, boulder retaining walls and individual boulder placement, construction of parking areas and picnic areas, placing crushed aggregate surfacing onto prepared roadways and parking areas, constructing concrete parking areas and walkways, and other miscellaneous work associated with a campground and described herein. B. Location: Work under this Contract is located in Mesa County, Colorado. The work locations are shown on the drawings. C. Materials Quantity Sheet: Describes the quantities of material or specific items required for the new construction as shown on the drawings for each individual work location, as well as the total quantity of items required for the project. C.3 GOVERNMENT CONTACTS PM/COR: Civil Engineer Blaine Vecchia - bvecchia@blm.gov - Office: (970) 244-3185 - Cell: (970) 549-6536 Contracting Specialist and Admin Contracting Officer: Robert Hall - rhall@blm.gov - 970-876-9038 Contracting Officer: David Thomas - dethomas@blm.gov - (303) 239-3637 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) The Contractor shall be required to (a) commence work under this contract within 14 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than May 26, 2023. Alternate I (Apr1984). If the completion date is expressed as a specific calendar date, computed on the basis of the contractor receiving the notice to proceed by a certain day, add the following paragraph to the basic clause: The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 1 Aug 2022. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Playgrounds / Parks / Athletic Fields

$1,000,000.00

Public - Federal

Paving, Renovation, Site Work

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
15
Bidding Soon
177
All Active Projects
84
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 1, 2022

September 6, 2022

May 26, 2023

img_map_placeholder

7914 S 16 1/2 Rd, Glade Park, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.