BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in San Andreas, California. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Calaveras Council of Governments (CCOG) is requesting proposals from experienced and qualified engineering or planning firms that can develop truck and freight movement data and other pertinent information in support of grant applications including, but not limited to, a 2022 Trade Corridors Enhancement Program (TCEP) grant application. Improved stopping sight distance o Reduced congestion-related crashes o Reduced rear-end crashes Questions due date: 5:00 p.m., Wednesday, May 11, 2022 Question should be directed to: Melissa Raggio, Interim Executive Director Calaveras Council of Governments mraggio@calacog.org (209) 754-2094 The term of the contract will be for one year. All questions should be submitted in writing and must be received by Close of Business of May 11, 2022 An elimination of all truck advisory miles between Angels Camp and the Port of Stockton, making it eligible to be an STAA truck route. Under existing conditions, trucks with trailers exceeding 30 feet are advised not to travel the six "wagon trail" miles. o A reliable east-west route for emergency response and disaster evacuations such as for the recent Butte Fire. o Improved access to the Stanislaus National Forest and other High Sierra recreational attractions. o A complete street facility that will allow for the mobility of pedestrians and bicyclists. Truck origins and destinations in the SR-4 Wagon Trail corridor. o Truck volumes on parallel corridors between the Sierra foothills and San Joaquin Valley. Because of the truck advisory on the 6.1 miles of SR-4 "Wagon Trail", truck volumes on the Eastern Segment may need to be extrapolated from parallel corridors to estimate truck volumes "after project" when the project is STAA compliant. o A description of how the project supports the Goals and Objectives and Freight Investment Themes identified in the California Freight Mobility Plan. o A description of how the project supports the goals of the National Highway Freight Program, the California Freight Mobility Plan, and the California Sustainable Freight Action Plan. o An economic assessment of how the project will benefit the economy and truck-related industries in Calaveras and Alpine counties. o A qualitative description of how the project addresses the three Freight System Factors and six Transportation System Factors listed in the Evaluation Criteria of the 2020 TCEP Guidelines. o The required truck-related Performance Metrics of a TCEP application including Congestion Reduction, Throughput, System Reliability, Velocity, Safety. o Calculation of how the project contributes to corridor or air basin emission reduction of greenhouse gases, diesel particulates (PM 10 and PM 2.5), carbon monoxide, nitrogen oxides, and other pollutants listed in the Performance Metrics. June 17, 2022 Notice to Proceed The CCOG may ask RFP finalists to provide oral presentations regarding their firm and any special expertise in the necessary areas. All finalists may be required to participate in negotiations and submit such price, technical, or other revisions of their proposals as may result from negotiations. CCOG also reserves the right to award the contract without discussion, based upon the initial proposals. CCOG reserves the right to waive any irregularity or informality in any proposal or in the RFP process, as long as, in the judgment of CCOG, such action will not negate fair competition and will permit proper comparative evaluation of the proposal submitted. CCOG reserves the right to waive any irregularity or informality in any proposal or in the RFP process, as long as, in the judgment of CCOG, such action will not negate fair competition and will permit proper comparative evaluation of the proposal submitted.

Post-Bid

Roads / Highways

$80,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
124
Bidding Soon
2,174
All Active Projects
874
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 18, 2022

June 17, 2022

img_map_placeholder

Multiple Locations, San Andreas, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.