BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Millersville, Maryland. Completed plans call for the renovation of a municipal facility.

The Work includes the following major items: Replace the existing three roof top units, replace the existing two chillers and replace the existing two chilled water pumps as shown on the drawings. Below is the purpose of this project: a. Replace the existing three roof top units b. Replace the existing two chillers c. Replace the existing two chilled water pumps The Contractor shall provide all required submittals to the Owner and Architect within forty-five (45) calendar days after Contract Award. Total Project: Should the Work not be performed on or before the times stated, there will be deducted from the Contract Balance the sum of one thousand dollars ($1,000.00) per consecutive calendar days, as Liquidated Damages, but not as a penalty, for each day's delay after expiration of such period, and until final completion of the Work and its acceptance by the Owner. Plus the contractor will be held responsible for additional extended general conditions, consumables, and direct labor costs to the Third Party Inspectors and the Architect for work and re-inspections required until the Contract Work is determined to be acceptable by the Owner. Completion of Punchlist Items: Should the Contractor fail to correct punchlist items within the 15 day period (beginning the date of the receipt of the list) there will be deducted from the Contract Balance the sum of fifty dollars ($50.00) per item per consecutive calendar days, as Liquidated Damages, but not as a penalty, for each day's delay after expiration of such period, and until final completion of the Work and its acceptance by the Owner. The cost range for the Project is: $ $500,000 to $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Municipal

$630,000.00

Public - County

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
177
Active Projects
90
Bidding Soon
2,273
All Active Projects
895
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2022

July 11, 2022

img_map_placeholder

411 Maxwell Frye Rd, Millersville, MD

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.