BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Hickory, North Carolina. Completed plans call for the construction of a 4,000-square-foot museum; 9,000-square-foot, three-story above grade conference / convention center; 36,000-square-foot educational facility; for site work for a museum; conference / convention center; museum; restaurant; and restaurant.

*As of October 3, 2023, this project is currently under construction and all trades are let. The work of this project is defined by the Contract Documents and includes, but not limited to, the following scope: All labor, taxes, materials, equipment, services, permits, incidental and implied, to construct a new Aviation Museum and CVCC Education Center. The project consists of the construction of an airplane hangar of approximately 4,000 SF for the Museum, a 9,000 SF shell space for a future Restaurant/event space and an education center of approximately 36,000 SF for Catawba Valley Community College The scope of work per contract documents are as follows: David E. Looper & Company, Inc. would like to invite you to participate in the bidding process for this new Airport Aviation Museum/Hangar, University lab and classroom and 3 story office and restaurant shell space. This facility will be a combination of Pre-engineered Metal Building and 3 story structural steel structure with elevated concrete decks. The project will have the following; Sitework: Grading, paving, sidewalks, stained concrete, Landscaping, chain link fencing and gates, site lighting, dumpster pad, bollards, concrete paving, water lines, sanitary sewer lines, storm sewer lines Building: Concrete foundations, structural steel, steel stairs, Steel railings, Casework, caulking, TPO roofing, Insulation, aluminum composite panels, Curtain Wall, Storefront, doors, frames, hardware, OH doors, light gauge framing, drywall, polished concrete flooring, resilient flooring, ceramic tile, painting, toilet and bath accessories, toilet partitions, fire extinguishers and cabinets, PEMB (including standing seam metal roofing, aluminum siding panels, interior liner panels, insulation), Fire Sprinkler system, Plumbing, Mechanical/HVAC and Electrical. This a CMAR project for DELCO requiring all subcontractors to be prequalified. Please find the prequalification forms within and return them previous to or on or about the time you submit your bid to us. RFI Cutoff/Deadline is July 28th at Noon.

Under Construction

Museum

$20,000,000.00

Public - City

New Construction, Site Work

287

4

64

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
122
Active Projects
75
Bidding Soon
1,144
All Active Projects
480
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 10, 2023

September 11, 2023

img_map_placeholder

3101 9th Ave Dr NW, Hickory, NC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.