BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Netcong, New Jersey. Contact the soliciting agency for additional information.

Step 1: Locate the incoming water service line The incoming water service line is typically found in the basement, main floor, or crawlspace of your house or business. The pipe can come up from the floor, as shown in the image to the right, or it can also come out of the side wall. Your shut-off valve and water meter are typically installed on this line after the point of entry. Step 2: Identify a testing area and conduct the inspection of your water service line To conduct the inspection properly you will need a penny (preferably somewhat shiny), a magnet, and a key, flathead screwdriver, quarter, or some other hard metal material with which you can scratch the surface of the pipe. Once you have located your incoming water service line, use your hard metal object and scratch the surface of the pipe between the shut-off valve and the point of entry. DO NOT use a knife, and be very careful not to puncture a hole in the pipe. You merely want to scratch the surface of it. After scratching the surface, compare the color of the pipe to the penny, and attempt to stick the magnet to the pipe. Step 3: Use your test results to identify the material of the pipe The Scratch Test After performing the scratch test, if the color of the pipe matches the penny, then your pipe is a copper material. If the pipe is a silver or grey color, try to determine whether or not it is shiny. If the pipe becomes shiny after being scratched, then it is likely a lead pipe. If the color remains a dull grey than it is likely a galvanized steel pipe. The Magnet test Regardless of color, just to be safe, attempt to stick a magnet to the pipe. A magnet will not stick to a copper or lead pipe. If the magnet sticks to your water service pipe, then your pipe is likely made of galvanized steel. The method of Contractor Selection has not been Determined at this time.

Final Planning

Municipal

Public - City

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
926
Active Projects
535
Bidding Soon
7,152
All Active Projects
2,993
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 28, 2022

img_map_placeholder

To Be Determined, Netcong, NJ

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.