Site work and renovation of a civil project in El Paso, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Works to be provided for this project shall be for furnishing all labor, materials, transportation, and services for the construction and installation as follows: The work at High Chaparral Reservoir will generally include but not be limited to demolition and reinstallation services. Pre-Demolition work will include Owner coordination to take the site out of service, remove and replace isolation yard valves and piping, draining the 3.5-million gallon steel ground reservoir, reservoir demolition activities, reservoir reconstruction, coating, startup and testing. Demolition activities will include the removal of the entire roof, entire roof support system, all columns and the entire floor area, as well as the existing gravel bedding and sand within the existing concrete ring beam area. Some items, generally including the exterior access ladder, level probe, level sensor, SCADA antenna will be removed, stored, protected and reinstalled. Demolition activities will include structurally supporting the existing tank wall at all times, site safety measures, noise mitigation, dust control and removal and disposal of all demolished items. Reinstallation work will include all the items mentioned, new roof, access hatches, roof penetrations for cathodic protection system, roof vent, all roof support, all columns and rafters and new tank floor area over new sand bedding. Within the existing ring beam area, a new cathodic protection system with rectifier will be installed to protect the floor. From the new roof, a cathodic protection hanging anode system and rectifier will be installed to protect the wall. The project work will include installation of new valves, both above grade and below grade, yard piping modifications, excavation, backfilling, all testing and the reinstallation of existing items as identified and confirm that such items will still properly function. The project work will also include grit blasting both the interior and exterior of the reservoir and providing new coating systems at each area. The project work will include all intended miscellaneous and ancillary items necessary to complete the project, including bringing the site back into services. The project description, as shown above, is only a general overview of this project. The Contractor shall refer to the project plans and specifications for further information. For additional information, submit your inquiry to the Purchasing / Contracts email address: Purchasing.Info@epwater.org. Engineer Estimate: $3,576,393.40 - $4,172,458.96 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$4,172,458.00

Public - City

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
26
Active Projects
3
Bidding Soon
265
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2022

June 20, 2022

Project location map

To Be Determined, El Paso, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.