BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Vallejo, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

In accordance with the Drawings and Specifications, the Work includes furnishing all labor, materials, tax, equipment, incidentals and services for the construction and completion of the City-Wide Sidewalk and Crosswalk Pedestrian Improvements Project FY 21/22. The work includes but is not limited to: Developing and implementing a water pollution prevention program, traffic control for street closures and detours, surveying and staking for proposed grades, remove and replace curb, gutter, sidewalk, and curb ramps, pavement striping signage and installation of rectangular rapid flashing beacon systems, radar feedback signs, and a traffic circle. Capital improvements shall include but are not limited to demolition, and all ancillary work associated with the work, completed in place as shown on the drawings and specifications. The Bidder shall include in his bid and provide all labor, tools and materials for a complete and working project in conformance with the intent shown on the drawings and specified herein. Online Q&A : Yes Q&A Deadline : 05/04/2022 10:00 AM (PDT) Liquidated Damages : $1,000/Per Calendar Day

Post-Bid

Sidewalks / Parking Lot

$352,655.00

Public - City

Paving, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
47
Bidding Soon
1,813
All Active Projects
783
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 13, 2022

img_map_placeholder

Multiple Locations, Vallejo, CA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.