Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Harper, Texas. Completed plans call for site work for a water / sewer project.
Q & A deadline: May 04, 2022 3:30:00 PM EDT This work is to be bid only by KUB pre-qualified contractors in the following area: 4.3 Gas Utility Construction, No Bid Limit and Nominal 4 inch and under pipe sizes in HDPE material. Bids will not be accepted from contractors who are not pre-qualified in the above-mentioned category prior to the bid opening. Notice of Award on or about May 11, 2022.Issue addendum if required by 3:30PM on May 5, 2022. Notice to Proceed on or about May 23, 2022 (commence date within 30 days) Substantial Completion within 210 days from the commence date in Notice to Description of Work: Work shall include the installation of 7,050' of 2" MDPE gas main and related facilities to serve Beaver Brook Dr, Cochise Dr, Ottari Dr, Ferndale Rd, Fielden Dr & Reddege Dr. The work shall be completed in strict accordance with the drawings and the Contract Documents. CONTRACTOR will provide all labor, materials, equipment, and incidentals as required to restore the Site to a condition equal to or better than the Site condition which existed prior to the initiation of the Work activities.
Post-Bid
Water / Sewer
$200,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 10, 2022
May 23, 2022
To Be Determined, Harper, TX
Related To This Project
Harper, TX
Bid Date: Jul 07 2022
Harper, TX
Bid Date: Jul 21 2022
Harper, TX
Bid Date: Sep 22 2022
Harper, TX
Bid Date: Apr 18 2022
Harper, TX
Bid Date: Mar 14 2024
Harper, TX
--
Harper, TX
Bid Date: Jan 06 2023
Harper, TX
Bid Date: Jan 05 2023
Bryan, TX
--
Houston, TX
--
San Antonio, TX
--
La Porte, TX
--
Humble, TX
--
Mont Belvieu, TX
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.