Site work and new construction of a water / sewer project in Springfield, Nebraska. Completed plans call for site work for a water / sewer project.

Material only procurement package for 165,000+ LF of 4710 HDPE force main piping consisting primarily of 14" & 20" pipe. There is a smaller share of 16", 24", 30", 36", & 48" pipe on the project. HDD trenchless installation requires SDR 11 pipe, while all other applications require SDR 21. Pipe lengths should be delivered in 50 ft lengths. This proposal package will procure HDPE pipe of all sizes for all work segments (listed below), and will include HDPE bends, fittings, electrofusion couplings, and other required material accessories. Monthly rental pricing for HDPE fusion machines (machine only, no operator labor) should be provided as an alternate for consideration. Costs should be provided as dollar per linear foot ($/LF) were applicable. Hawkins Construction is the Construction Manager at Risk (CMaR) for this project. The proposed project area is generally located between the City of Springfield’s Wastewater Treatment Facility (SWWTF) at 17305 S Hwy 50 and extends east to the City of Omaha’s Papillion Creek Waste Resource Recovery Facility (PCWRRF) located at 15705 Harlan Lewis Road in Bellevue, Nebraska. The project is commonly referred to as Phase 1A of the system. Phase 1A will include three (3) lift stations, approximately 16 miles each of 20" & 14" HDPE force main interceptor and approximately 1.5 miles of gravity main interceptor. Teaming Approach: As Construction Manager, Hawkins Construction prequalified "Team Members" who will be allowed to propose and perform the force main and gravity sewer pipe work. These team members are Hawkins Construction of Omaha, NE, Heimes Corp of Omaha, NE, and Van Kirk Brothers Contracting of Sutton, NE. The work will consist of 7 separate bid packages as follows: Pipe Procurement (Material Only) Lift Stations (3 separate locations) - HCC acting as CM/GC Zweibel Creek Gravity Interceptor Force Main Segment 1 Force Main Segment 2 Force Main Segment 3 Force Main Segment 4 The project duration can generally be described as 24 months beginning in August 2022. This project has the following State & Federal Requirements MBE/WBE/DBE Subcontractor Participation Fair Share per 40 CFR 35.6580. - 14% (6% MBE & 8% WBE) E-Verify Federal Immigration Verification Davis Bacon Prevailing Wage & Certified Payroll American Iron and Steel (AIS) Products per FWPCA Section 608 A full listing of the State and Federal Regulations can be found at and is based upon the EPA’s listing of “Additional Information on Cross-Cutting Federal Authorities” (http://water.epa.gov/grants_funding/dwsrf/xcuts.cfm) and the EPA’s “Cross-Cutting Federal Authorities: A Handbook on Their Application in the Clean Water and Drinking Water State Revolving Fund Programs” (October 2013: http://www2.epa.gov/sites/production/files/2015-08/documents/crosscutterhandbook.pdf) as of October 12, 2015. This list is subject to change based upon the federal authorities of the EPA.

Post-Bid

Water / Sewer

$1,000,000.00

Public - County

New Construction, Site Work

147

21

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
125
Active Projects
63
Bidding Soon
853
All Active Projects
361
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 20, 2022

July 19, 2022

August 1, 2024

img_map_placeholder

17305 NE-50, Springfield, NE

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.