EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 22, 2022 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a mixed-use development in Saint Paul, Minnesota. Completed plans call for the renovation of a municipal facility; for site work for a municipal facility; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and water / sewer project.

As of June 21st, 2022 this project is pending an award decision. State Project Number 02VA0015 Capitol Complex Ramps Repairs 2022 This project is Targeted Group/Economically Disadvantaged/Veteran-Owned preference.> A. The work will done under one prime contract that includes: General, Mechanical, and Electrical construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1.) Admin Ramp, 50 Sherburne Avenue: Concrete repair, installation of supplemental steel supports, waterproof deck-coating, replacement of drain piping, heat trace, and insulation. 2.) 14th Street Ramp, 135 E. 14th Street: Joint sealant replacement, Tee flange connector repair. 3.) Ramp 4: Partial depth overhead concrete patching, investigation of post-tensioning system.

Award

Sidewalks / Parking Lot

$578,832.00

Public - City

Renovation, Site Work

29

18

20

7

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
70
Bidding Soon
888
All Active Projects
474
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 17, 2022

June 16, 2022

img_map_placeholder

Multiple Locations, Saint Paul, MN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.