Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 11, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Gainesville, Texas. Completed plans call for the renovation of a educational facility.

Repair the nonfunctioning door consoles with new relays and direct connections to the door control and eliminating the current existing computer technology that has failed, and is no longer supported by the Manufacturer using the following material: 25 pair Bridge Board. 25 Pair Cable. Allen Bradley 1606 XLE120E Power Supplies . Altronix 5Amp 24V. . 500' rolls 18 gage Wire Brown, Yellow, Blue. Back Boxes, Wire Nuts, Misc Part

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
147
Bidding Soon
4,177
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 11, 2022

June 10, 2022

Project location map

1379 FM678, Gainesville, TX

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed